1780: The retention and completion of the importation of soil for the purposes of land improvements at Park, Tinryland, Co. Carlow
Park, Tinryland, Carlow
DecisionConditional grant
Decided13 February 2018
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20178Of 14/141 - for retention for road boundary and entrance with security gates, internal road network, parking facilities, tele sales portable buildings, maintenance portable buildings, canteen portable buildings and training area portable buildings, front extensions, side extensions, rear extensions, first floor extensions and ancillary plant services to existing processing unit, storage facility, bore well, proprietary effluent treatment system and ancillary works relocation ESB sub station and ancillary services. permission sought for storage area unit (dry store and fridge/freeze areas) etc. site development works, construction of internal road network and parking facilities, footpaths, connection and installation of telecommunications, electricity supply, the erection of street/yard lighting, the erection of site boundaries/sound barriers landscaping and ancillary services / 0.0 km away / 29 July 2020Conditional grant
- 2460073Retention Permission for the as constructed storage / collection area extension to south elevation of permitted commercial unit. Planning permission is sought for the construction of (a) extension consisting of a covered loading area to the north elevation of existing commercial unit, (b) extension consisting of covered loading area to the east elevation existing commercial unit (c) all associated site development works / 0.1 km away / 30 August 2024Conditional grant
- 17221For a change of use of existing agricultural building of 1820m2 to light industrial, and all ancillary site works / 0.2 km away / 04 April 2018Conditional grant
- 17117(1) Retention permission for as built dwelling and (2) Permission to erect a 91m2 extension to the side of the existing 78m2 dwelling, construct a 35m2 domestic garage and upgrade the existing on-site effluent disposal system / 0.2 km away / 19 September 2017Conditional grant
- 23140To construct an agricultural storage shed of 846m2 internal floor area, associated external concrete apron of 337m2 in area and all associated ancillary site works / 0.3 km away / 19 December 2023Conditional grant
- 246039848no. residential units (43no.- three bed dwellings, 2no.- four bed dwellings, & 3no.- two bed dwellings), a Childcare Facility (of 319sq.m) and all associated car parking, play areas, landscaping, and all associated site works to include a construction access from the partially complete Carlow Inner Relief Road direct to the proposed site. The subject site has a gross area of 2.739ha and is located at Mortarstown, Carlow, Co. Carlow with proposed access from the partially completed Carlow Inner Relief Road and through the practically complete Cluain Bui residential development. / 1.2 km away / 19 November 2025Conditional grant
- 2460205A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application / 1.2 km away / 24 April 2025Conditional grant
- 2660080The change of use of existing domestic garage for use as a granny flat ancillary to the use of the existing dwelling house including elevational alterations to same, full planning permission is sought to construct a single storey extension to the rear of same and to construct an extension linking the existing building to the existing dwelling house, all ancillary site works and services / 1.3 km away / 19 May 2026Conditional grant