Conditional grantDecided 20 January 2020Carlow County Council

19337: Proposed construction of a calf housing unit, with a single bay machinery shed, to an approximate height of 6.925m, as well as an external foul-water retention tank, and all associated ground-works

Craanlusky, Milford, Co. Carlow
DecisionConditional grant
Decided20 January 2020
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Carry out development in accordance with plans received 30/08/19 and amended by FI received 20/12/19.Compliance
  • 2Permission limited to the detailed development; does not authorise other exempted development.Compliance
  • 3Neutral finish on external concrete walls; dark green matt finish on roof and side wall sheeting/panels.Design Materials
  • 4Agricultural use only; no commercial use except incidental to farming.Occupancy
  • 5Sight lines at road entrance per DMRB and site plan. Road opening works require a Road Opening Licence per Guidelines for Managing Openings in Public Roads (2007).Traffic Access
  • 6Sign Irish Water connection agreement prior to commencement. Comply with Irish Water connection and CDS Technical Documentation.Water Services
  • 7Protect existing drainage. Surface water to soakaways/system per BS 8301:1985 and BRE Digest 365. No runoff to road or adjoining properties.Wastewater Drainage
  • 8No interference with watercourse works. Maintain 5m undisturbed buffer along western watercourse during construction. No pollutant discharge.Environment Ecology
  • 9Implement controls per Screening for AA and CEMP (20/12/19). Comply with CIRIA C532. Bunded storage for fuels/materials. Ready-mix concrete only. Control invasive species, noise, vibration, and dust per specified standards.Construction Management
  • 10Design, construction, and operation per S.I. 1605/2017 (Good Agricultural Practice for Protection of Waters). Farm building per TAMS specifications. Slurry management per EU GAPPWR 2017.Wastewater Drainage
  • 11Off-carriageway parking during construction. Keep public road clean. Maintain litter skips. Limit noise/dust beyond boundary.Construction Management
  • 12Construction hours Mon-Fri 08.00-18.00, Sat 08.00-13.00. No Sundays/Bank Holidays without prior written approval.Construction Management