GrantedDecided 07 January 2020Carlow County Council

Donore, Bagenalstown, Co. Carlow

Planning application 19349
DecisionConditional grant
Decided07 January 2020
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons12conditions8nearby records

Proposed development

Application description published by Carlow County Council.
The construction of a single storey dwelling, domestic garage, septic tank & percolation area, new entrance, bored well and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • a/b/c/d5-year owner-occupier requirement for applicants and immediate family. Section 47 agreement required before commencement. Written confirmation of first occupation required within 2 months.Occupancy
  • Second Schedule / UnnumberedRevised site layout plan required to align dwelling footprint with elevation drawings (08-19 GOR-02) prior to commencement.Compliance
  • 9(a/b/c)External finishes per approved elevation drawings. Nap plaster in neutral colour, roof blue/black or slate grey. Garage to match dwelling. No white uPVC for windows/rainwater goods. Entrance wing walls/piers max 1.2m.Design Materials
  • UnnumberedGarage to be used solely incidental to the dwelling. Not for self-contained living or commercial use.Compliance
  • 11(a/b)DMRB sightlines at entrance. Road opening licence required for public road works.Traffic Access
  • 12(a/b/c)Surface water to soakways/system per BS 8301:1985 and BRE Digest 365. No surface water to road or adjoining properties. Inspection manholes required.Wastewater Drainage
  • 13(a/b)Landscaping plan with indigenous tree and hedgerow planting on boundaries. Replace failed planting.Landscaping Boundary
  • 14Strict separation of clean surface water and foul waste. On-site wastewater system per EPA Code of Practice 2009. Percolation pipes from distribution box with vents, carbon filters, pipe seals, effluent filters. Grease trap required. Testing certification per EN12566/SR 66.Wastewater Drainage
  • 15(a/b/c/d)Irish Water connection agreement and compliance with technical documentation required if connecting to public network.Water Services
  • 16(a/b/c/d)Off-carriageway parking for construction traffic. Site kept clean. Noise/dust controlled. Restricted hours: Mon-Fri 08:00-18:00, Sat 08:00-13:00. No Sundays/Bank Holidays.Construction Management
  • 17(a/b)Service poles relocated underground prior to construction at applicant's expense. Consult Chief Fire Officer and comply with recommendations.Compliance
  • 18€4,026.00 development contribution payable prior to commencement, with 5% annual interest from grant date.Development Contribution

Planning a project near Donore, Bagenalstown, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →