Conditional grantDecided 20 October 2020Carlow County Council

20153: Proposed planning permission and change of use to fully renovate the existing school building for residential use, proposed rear extension, renovate old outdoor toilet to form new garage, the reusing of an existing agricultural entrance as a proposed vehicular entrance, proposed new borewell, proposed foul water treatment tank and associated percolation area, proposed storm water soakaways and all associated site works

Rathnageeragh, Garryhill, Muinebheag
DecisionConditional grant
Decided20 October 2020
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons14conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 18/05/20 and amended by FI on 06/10/20.Compliance
  • 2Dwelling to be first occupied as permanent residence of applicant and immediate family for 5 years. Section 47 agreement required prior to commencement.Occupancy
  • 3External finishes per Drawing P-01: neutral render, blue/black or slate grey roof. Garage rendered walls with galvanised roof. No white uPVC for windows or rainwater goods.Design Materials
  • 4Retain/maintain boundary planting per Site Layout Plan. New planting to be indigenous species. Northern boundary planting to have 4-5 years growth.Landscaping Boundary
  • 5Lines of sight at entrance per DMRB. Road opening licence required prior to commencement.Traffic Access
  • 6Surface water to be collected and disposed of to soakaways per BS 8301:1985 and BRE Digest 365. No discharge to public road or adjoining properties.Wastewater Drainage
  • 7On-site domestic wastewater treatment system and percolation area to comply with EPA Code of Practice 2009. Certificate of compliance and as-constructed drawings required prior to occupation.Wastewater Drainage
  • 8Surface water and foul waste to be kept separate. Foul waste to wastewater system, surface water to soakaways.Wastewater Drainage
  • 9If connecting to public network, sign Irish Water agreement prior to commencement and comply with CDS Technical Documentation.Water Services
  • 10Adequate off-carriageway parking for construction traffic. No parking on public road. Site to be kept neat and litter-free. Noise and dust emissions controlled.Construction Management
  • 11Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays.Construction Management
  • 12Service poles relocated prior to construction. All ESB, telephone and other cables located underground.Compliance