GrantedDecided 11 August 2020Carlow County Council

Scoil Molaise, Old Leighlin, Co. Carlow

Planning application 20191
DecisionConditional grant
Decided11 August 2020
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons13conditions8nearby records

Proposed development

Application description published by Carlow County Council.
For the provision of a new temporary single storey standalone prefabricated structure containing 2 no. SET classrooms (floor area = 35.0 sq.m) to the front of the existing school building, together with all associated site works.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received on 18/06/20.Compliance
  • 2Structure must be removed after 5 years unless renewed permission is granted.Occupancy
  • 3Permission is limited to the submitted application and does not cover other site development.Compliance
  • 4Disabled access must be provided per Building Regulations and NDA guidelines.Compliance
  • 5External finishes must match Drawing PLN-001 and be neutral in colour.Design Materials
  • 6All mature trees and hedgerows on/along boundaries must be retained and maintained.Landscaping Boundary
  • 7No interference with existing drainage. Surface water must be directed to site soakaways/system per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
  • 8Strict separation of surface water and foul waste discharge systems.Wastewater Drainage
  • 9Irish Water connection agreement required prior to commencement; must comply with CDS Technical Documentation.Water Services
  • 10Construction traffic management: off-carriageway parking, no road parking, keep road clean, control noise/dust, maintain litter-free site.Construction Management
  • 11Restricted construction hours: Mon-Fri 08:00-18:00, Sat 08:00-13:00. No work Sundays/Bank Holidays.Construction Management
  • 12Service poles relocated before construction. All ESB/telecom cables must be underground unless otherwise agreed.Traffic Access

Planning a project near Scoil Molaise, Old Leighlin, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →