2032: For the construction of a dormer style extension to the rear elevation of our existing dwelling and all associated site works
No. 7 Bestfield, Athy Road, Carlow
DecisionConditional grant
Decided16 October 2020
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons12conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- , Development must be carried out in accordance with plans submitted on 05/02/2020, as amended by documents submitted on 14/09/2020 and 22/09/2020.Compliance
- , Ancillary family accommodation must remain incidental to the principal dwelling, cannot be separated by lease or sale, and must revert to the original family house when no longer required.Occupancy
- , External roof finishes must be blue/black natural slate and must match the existing dwelling.Design Materials
- , A development contribution of €739.00 must be paid prior to commencement. Interest at 5% p.a. applies from the grant date to the payment date, with the first 90 days discounted.Development Contribution
- , Any service poles requiring relocation must be moved prior to removal of the site boundary or commencement of construction works, at the applicant's expense.Traffic Access
- , All ESB, telephone, and other service cables must be located underground. Existing poles must be relocated prior to commencement if necessary, at the applicant's full expense.Design Materials
- , Site must be kept neat and litter-free with waste skips on site. Noise and dust emissions must not significantly impair adjoining amenities. Roads must be kept clear of debris; cleaning at applicant's expense if needed.Construction Management
- , The grant does not permit felling or uprooting trees. A felling license under the Forestry Act 1946 is required. Developers must contact the Forest Service before felling.Environment Ecology
- , Works restricted to Monday to Saturday 8.00am to 6.00pm. No activity on Sundays or Public Holidays unless prior written approval is obtained from the Council.Construction Management
- , All development works are subject to inspection by the Council's Technical Staff.Compliance
- , Prior to commencement, the developer must consult with the Chief Fire Officer and strictly comply with their recommendations.Compliance
- , Applicant must sign an Irish Water connection agreement prior to commencement and adhere to Irish Water standards. Proposals to build over or divert water/wastewater services require written approval from Irish Water before works commence.Water Services
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 5ca9fe4f-508c-4c19-9445-5f74bc0ebc77.pdf / Document 113550Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 25a49cef-34dc-4301-b9de-cd70aec62e6d.pdf / Document 107650Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / F0cad462-7f77-44e8-b20a-6e95de8882cc.pdf / Document 149875Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / Bbbd1dd3-99fc-4fc0-927d-fdad9435daaf.PDF / Document 75289Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 17297Permission sought to remove existing porch at front of house, erect new porch and all associated site works / 0.1 km away / 28 November 2017Conditional grant
- 2360058For the following alterations to my existing dwelling to include, the demolition of an existing single storey extension to the rear (west elevation), to be replaced with the construction of a new dormer style extension, the construction of a single storey extension to the side (north elevation), the demolition of existing domestic sheds, the construction of a new domestic shed, alteration to my existing entrance, and all associated site works / 0.3 km away / 13 October 2023Conditional grant
- 19224To retain existing entrance onto public roadway / 0.3 km away / 10 October 2019Conditional grant
- 20286The development consists of a single storey modular building consisting of 2 No. classrooms and 1 No office and sanitary facilities together with all ancillary and associated site development works / 0.4 km away / 05 October 2020Conditional grant
- 19416The erection of new stand alone single storey classroom unit with toilet and office facilities, along with repositioning of the existing bin store enclosure and associated landscape works. / 0.4 km away / 06 December 2019Conditional grant
- 201The construction of a new 2.4m high fenced area adjacent to the existing Gas Networks Ireland installation. The development will also include the installation of a new 9m long by 3m wide by 3m high telecommunications container and a diesel generator. Access to the development will be through the existing Gas Networks Ireland access road. / 1.1 km away / 27 February 2020Conditional grant
- 21200Permission for the replacement of approximately 142m of existing 2.4m high chain link fencing and associated gates with 142m of new 2.4m high green palisade security fencing / gates and all associated site works at an existing Above Ground Natural Gas Installation at Strawhall Above Ground Installation (AGI) / 1.1 km away / 26 July 2021Conditional grant
- 22416Demolition of existing single storey dwelling and construction of 2no. two storey semi detached dwellings in its place and all associated works / 1.1 km away / 13 April 2023Conditional grant