Ballintrane, Fenagh, Co. Carlow
Planning application 2128
DecisionConditional grant
Decided13 December 2021
Application typeRETENTION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Low OCR quality: verify against source documentsNo refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballintrane, Fenagh, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 54f1da66-c286-4911-b0a5-e9d463d418ec.pdf / Document 112230Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / A3ac4b02-a5d6-4b0d-881a-1a93198ee322.pdf / Document 112229Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / B23eb849-ebd3-478b-9357-e4a6cd3736a4.pdf / Document 112228Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2069Extension of Duration of PL Ref: 14/251 - (a) Instillation of 2 No. bio-filters; (b) development of truck intake air lock building; (c) development of a bring centre for domestic waste; (d) intensification of use of facility resulting in acceptance and processing of 40,000 tonnes per annum of material for composting and 20,000 tonnes per annum of general waste for recycling and recovery; and (e) all associated site works. The current use of the subject site is subject to a Waste Permit and this application relates to development which comprises and is for the purposes of an activity that would require an Industrial Emission License (the proposed activity would previously have required a Waste Licence but this requirement has been substituted by a requirement to obtain an Industrial Emission Licence by the European Union (Industrial Emissions) Regulations 2013). An Environmental Impact Statement has been prepared and submitted with this application. / 0.0 km away / 05 June 2020Granted
- 19429Change of use from workshop and yard into a domestic residence. The work to include the conversion of existing structure into a two storey, 3 bedroom residence and upgrading the existing septic tank installation to a wastewater treatment system and sand polishing filter / 0.5 km away / 26 March 2020Granted
- 23163Retention planning permission for the portion of the residence which does not comply with the original granted planning permission from Carlow County Council (Planning Ref: No. 19412) / 0.5 km away / 06 June 2024Granted
- 23112Permission for construction of an agricultural building incorporating a milking parlour, dairy, plant room and office, a slatted slurry tank, collecting yard and associated site works / 0.5 km away / 24 May 2024Granted
- 18287Permission to construct a new lean-to extension to existing agricultural sheds and all associated works at existing farmyard / 0.9 km away / 14 September 2018Granted
- 2243Permission for development consisting of an agricultural shed for the storage of straw. Permission is also sought to relocate a utility pole to site boundary along with all associated site / 1.1 km away / 06 May 2022Granted
- 18419For the indefinite retention of a 48m2 extension to the rear of my existing dwelling and indefinite retention of a 23m2 detached single storey home-office / 1.3 km away / 21 May 2019Granted
- 2460052A side extension to existing processing facility and all associated works to facilitate the development / 1.3 km away / 17 July 2024Granted