GrantedDecided 19 July 2022Carlow County Council

Newtown, Bagenalstown, Co. Carlow

Planning application 21465
DecisionConditional grant
Decided19 July 2022
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons15conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Permission to construct a storey and a half style dwelling house, domestic garage, new site entrance, bored well, septic tank and associated percolation area, all ancillary site works and services

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Build strictly in accordance with plans received 26/11/2021, amended by FI received 13/05/2022 and 23/06/2022.Compliance
  • 2First occupation must be as permanent residence of applicant and immediate family for 7 years. Section 47 Agreement required before works start. Written confirmation of occupation within 2 months.Occupancy
  • 3External finishes per elevation drawings 01-FD-21R and 02-FD-21R. Napp plaster neutral colour; front porch natural indigenous stone.Design Materials
  • 4Boundary planting retained/maintained per Site Layout 04-FD-21R. New planting indigenous species, completed first planting season, replaced on failure.Landscaping Boundary
  • 5Sightlines 90m either direction per DMRB. Front boundary set back 3m from road edge. Verge kept clear. Road Opening Licence required before commencement.Traffic Access
  • 6Site entrance wing walls and piers height limited to 1.3 metres.Design Materials
  • 7Do not impair existing drainage. Surface water collected and disposed to soakways/system per BRE Digest 365 with inspection manholes. No discharge to road or adjoining properties.Wastewater Drainage
  • 8Strict separation: clean surface water to soakpits/system; only foul/soiled water to wastewater treatment system.Wastewater Drainage
  • 9On-site system per EPA Code of Practice 2021. Certificate of Compliance by qualified person before first occupation. Septic tank tested per LS. EN 12566. Soakaways per BRE Digest 365. Percolation pipes from distribution box with liquid levelling device. Activated carbon vent filters. Well min 15m upstream of percolation area. No surface water infiltration. Domestic grease trap installed.Wastewater Drainage
  • 10Public network connection requires Irish Water agreement before commencement. Comply with Irish Water CDS Technical Documentation. Subject to Capital Investment Programme constraints.Water Services
  • 11Off-carriageway parking for construction traffic. No parking on public road. Prevent muck/debris on road. Site kept neat/litter-free. Noise and dust emissions controlled.Construction Management
  • 12Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays/Bank Holidays without prior written approval.Construction Management

Planning a project near Newtown, Bagenalstown, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →