22425: The construction of a bungalow style dwelling, on site wastewater system, bored well, access from existing private lane and all associated site development works
Powerstown, Milford, Co. Carlow
DecisionRefused
Decided14 February 2023
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Bd72421a-92f3-435e-99d8-691bc4f3c502.pdf / Document 106465Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / Fd48d4ad-0133-49b7-94dc-4203b822aad3.pdf / Document 106466Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460253To construct a single storey extension to the side of existing single storey dwelling, demolition of existing garage, new percolation area and waste water treatment system, use of existing on site services, use of existing entrance and all associated site works / 1.5 km away / 12 May 2025Refused
- 20155The construction of a single storey dwelling house, formation of a new vehicular entrance and driveway, bored well, wastewater treatment system and polishing filter and all associated site works. A Natura Impact statement has been prepared in respect of the planning application. / 2.9 km away / 17 July 2020Refused
- 23175Extension of Duration for PL18/169: Construction of 4 No. 3 Bedroom semi-detached houses, 1 no 3 Bedroom Detached house plus all associated site works, boundary walls/railings, public footpath, car parking etc. / 3.3 km away / 07 December 2023Refused
- 266Extension of Duration of PL20/308 for the construction of a single storey dwelling, septic tank and percolation area, upgrading of existing entrance, bored well, connection to services and all associated site works / 3.3 km away / 07 April 2026Refused
- 2460005To construct a single storey dwelling, single storey garage, new domestic entrance from an existing agricultural laneway, septic tank & percolation area, bored well and all associated site works / 3.4 km away / 19 September 2024Refused
- 18111The construction of 39 No. new dwellings to include; 25 No. Terraced two storey houses (2 & 3 beds), 4 No. Semi-Detached bungalow houses (2 beds) and 10 No. Semi-detached two storey houses (2 & 3 beds); with the provision of rear access into terraced houses for bin storage, and associated parking; together with the completion of all previously granted landscaped areas, roads, footpaths and site development works associated with the previously granted development under PL Reg.No. 03/430 (PL01.206855). / 3.5 km away / 21 March 2019Refused
- 2460043A 10 Year Planning Permission for a solar farm with a total area of circa 192 hectares. The solar farm will consist of solar panels on ground mounted frames, 30 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 4 no. Ring Main Units, 8 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 2 no. stream deck crossings and 1 no. horizontal directional drill, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 4 no. entrances from the L3051, L3052 and L3050. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application / 3.5 km away / 25 March 2025Refused
- 22188The completion of an unfinished estate at Gort Na Greine, Ballinabrannagh to include the construction of 8 No. semi-detached two storey dwellings at sites 43-50, I no. 2 storey detached dwelling at site 42, plus the construction of 17 No. two storey detached dwellings (types A/A1/A2, B/B1, D/D1) all with detached single storey garages at sites 1-17, the construction of 5 No. detached bungalows (types C1/C2) all with detached single storey garages at sites 18-22, plus all associated landscaping and site works. Sites 1-22 to be accessed via an existing site access and road network serving Gort Na Greine, Ballinabrannagh, Co. Carlow / 3.7 km away / 13 January 2023Refused