Conditional grantDecided 07 September 2023Carlow County Council

23123: To construct a part dormer & part single storey dwelling, appropriate waste water treatment system, new entrance, domestic garage, connection to existing mains water and all ancillary site works and landscaping

Newtown, Muine Bheag, Co. Carlow
DecisionConditional grant
Decided07 September 2023
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons16conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received 19/07/2023.Compliance
  • 2Permission relates only to plans received 19/07/2023 and excludes other site development.Compliance
  • 3First occupation as permanent residence of applicants and immediate family for 7 years. Section 47 agreement required before commencement. Occupation confirmation within 2 months.Occupancy
  • 4External walls to napped render in neutral colour per elevational drawings Ref 02/06. No white uPVC for windows, doors, or rainwater goods.Design Materials
  • 5Garage use strictly incidental to dwelling. No self-contained dwelling, business, or commercial activity.Other
  • 6Driveway to unbound gravelled surface. Lines of sight per DMRB and Site Layout Plan Ref 01/06 established before construction. Gateway to simple timber/stone form ≤1.5m.Traffic Access
  • 7Site-specific landscaping scheme to be agreed in writing prior to commencement, including implementation timescale.Landscaping Boundary
  • 8No surface water to public road or adjoining properties. All surface water to soakaways/system per BRE Digest 365. Road opening licence required. No materials on public road.Wastewater Drainage
  • 9Only clean surface water to soakpits/system. Only foul/soiled water to wastewater treatment system.Wastewater Drainage
  • 10Wastewater system and percolation/polishing filter per EPA Code of Practice (P.E. ≤ 10) issued 7 June 2021. Certificate of Compliance before occupation. Tested per I.S. EN 12566. Min one flush out valve. Built to drawing WTS01-001 (July 2023). No surface water infiltration. Grease trap installed.Wastewater Drainage
  • 11Irish Water connection/self-lay agreement required before commencement. Compliance with Irish Water CDS Technical Documentation.Water Services
  • 12Off-carriageway parking for construction traffic. No road parking. Prevent road debris. Site kept neat. Noise/dust controlled beyond site boundary.Construction Management