Lime Grove, Palatine, Co. Carlow
Planning application 2360202
DecisionConditional grant
Decided06 February 2024
Application typeRETENTION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lime Grove, Palatine, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 7beb7020-a48c-4c4b-997f-818626e06035.pdf / Document 107692Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / C739a889-7b0c-439d-8ff5-c9c3827c8786.pdf / Document 107691Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 9307b36b-281b-4db8-b9e6-48cdeeb55712.pdf / Document 109691Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 65da8efa-fd23-47cb-b95b-4bbda2a291dc.pdf / Document 107694Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / F655f701-d114-4e01-a866-b4a7b94fa7e5.pdf / Document 103593Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22233To retain an existing as built single storey utility room extension, with a floor area of 7.7m2 to the side of existing two storey semi detached dwelling, minor alterations and all ancillary site works / 0.0 km away / 01 September 2022Granted
- 2460177For the construction of 14 No. semi-detached two storey dwellings consisting of 6 No. three bed semi-detached houses and 8 No. four bed semi-detached houses, connection to existing onsite services, associated private car parking spaces, boundary treatments, street lighting and all associated site works / 0.1 km away / 19 June 2025Granted
- 2360194No.1. the construction of a partially built two storey dwelling as previously granted under Pl.No.05/267. No.2. permission for the completion of said two storey dwelling, connection to services, and all associated site works / 0.1 km away / 02 February 2024Granted
- 22316An extension to the front of existing dwelling house, including all associated site and landscaping works / 0.2 km away / 15 November 2022Granted
- 17100PL12/100 Construction of a one and a half storey dwelling to passive house standard with attached garage, mechanical aeration unit and polishing filter connected to mains water supply, new entrance and all associated site works previously permitted under PL10/323 / 0.2 km away / 25 May 2017Granted
- 20263For alterations to our existing dwelling to include an attic conversion, 5 No. velux windows to rear elevation and all associated site works / 0.3 km away / 23 September 2020Granted
- 185Planning permission is sought to construct a bungalow, garage, waste water treatment unit and polishing filter and all other ancillary site works. / 0.3 km away / 25 July 2018Granted
- 2460362Alterations to existing dwelling to include the construction of a single storey extension to the rear elevation of said existing dwelling, change of use of an adjoining domestic garage to use as habitable part of exiting dwelling, installation of 3. no velux roof windows to the rear, conversion of attic space to use as storage/playroom, internal alterations and all associated site works / 0.3 km away / 16 January 2025Granted