Conditional grantDecided 05 December 2023Carlow County Council

2360210: The construction of dormer style dwelling, a domestic garage, a bored well, new entrance, a Septic tank & percolation area & all associated site works

Ballybar Upper, Tinryland, Co. Carlow
DecisionConditional grant
Decided05 December 2023
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons14conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must follow approved plans received 21/09/2023 as amended by the 15/11/2023 FI response.Compliance
  • 3Dwelling must be first occupied as permanent residence by applicants and immediate family for 7 years. Section 47 agreement required before works start.Occupancy
  • 4External finishes for dwelling and garage must match approved elevational drawings.Design Materials
  • 6Landscaping per Juno Landscaping Ltd plan (15/11/2023). Planting in first season, replace failures within 5 years.Landscaping Boundary
  • 7Entrance sightlines per DMRB. Road opening licence required prior to commencement.Traffic Access
  • 8Site entrance wing walls and piers height limited to 1.2 metres.Design Materials
  • 9Do not impair existing drainage. Surface water collected to soakaways per BS 8301:1985 and BRE Digest 365. Only clean surface water diverted.Wastewater Drainage
  • 10Apply to Uisce Eireann for water connection per Policy WS.P6. Connection agreement required prior to commencement.Water Services
  • 11On-site wastewater system per EPA Code of Practice (PE ≤ 10) issued 7 June 2021. Certification per I.S. EN 12566 required. Technical specs for percolation pipes, distribution box, vents, and grease trap apply.Wastewater Drainage
  • 12Off-carriageway parking for construction traffic. No parking on public road. Site kept neat/litter-free. Noise/dust controlled.Construction Management
  • 13Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays.Construction Management
  • 14Service poles relocated prior to construction at applicant expense. All cables placed underground.Traffic Access