Conditional grantDecided 19 March 2024Carlow County Council

2360256: The renovation and extension of an existing derelict cottage for use as a residential dwelling, including the installation of a wastewater treatment system and all associated site works. Retention is also required for a mobile home unit onsite for a temporary period until the completion of the construction works, and a driveway off existing vehicular site entrance to access the cottage. A Natura Impact Statement (NIS) has been prepared in relation to the development and accompanies this planning application

Hillview, Knockeen, Co Carlow
DecisionConditional grant
Decided19 March 2024
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons12conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out per plans received 03/11/2023 (amended 23/01/2024). Supersedes reg. ref. 20/333.Compliance
  • 2Permission authorises only the detailed development; excludes other unapproved works.Compliance
  • 3Mobile home retention limited to max 3 years or completion of works. Must be removed, disconnected from WWT system, and ground restored. Limited to ancillary storage/residential use. Evidence of removal required within 3 months of occupation.Occupancy
  • 4Cottage not to be sold or conveyed separately from the site/existing dwelling.Compliance
  • 5NIS mitigation measures must be strictly adhered to and implemented in full.Environment Ecology
  • 6Driveway/parking to have unbound gravelled surface (no concrete/tarmac). Lines of sight per DMRB and Drawing A.02 established prior to commencement.Traffic Access
  • 7Surface water contained on site per BRE Digest 365. No runoff to road/adjacent properties. Inspection manholes required. No materials/debris on public road. Road Opening License required for any road/footpath opening.Wastewater Drainage
  • 8Sand polishing filter flush out valves required. WWT system per EPA Code of Practice (PE ≤ 10). Certificate of Compliance with as-constructed drawings required before first occupation. System tested per I.S. EN 12566. No surface water infiltration. Grease trap installed. Disconnect mobile home from existing septic tank.Wastewater Drainage
  • 9Connection agreement with Irish Water required prior to commencement. Comply with CDS Technical Documentation. Subject to Irish Water Capital Investment Programme constraints.Water Services
  • 10Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays/Bank Holidays without prior written approval.Construction Management
  • 11Service poles relocated prior to construction at applicant expense. All ESB/telecom cables located underground.Traffic Access
  • 12Consult Chief Fire Officer prior to commencement and comply with fire safety requirements.Compliance

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.