Rickettstown South, Rathvilly, Co. Carlow
Planning application 2451
DecisionConditional grant
Decided22 January 2025
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must follow plans received on 22/11/2024.Compliance
- 2Permission limited to development described in public notices and received plans.Compliance
- 3Revised elevations with vertical emphasis windows required. Bathroom/en-suite glazing must be opaque/frosted. External finishes per Drawing 202 using indigenous stone and neutral render.Design Materials
- 4Existing boundary planting must be retained and maintained per Drawing 203.Landscaping Boundary
- 5Lines of sight at road entrance per DMRB. Road opening works require a Road Opening Licence per Guidelines 2017.Traffic Access
- 6Do not impair roadside drainage without agreement. No surface water to public road/adjoining properties. Surface water to soakways per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
- 7Sign Uisce Éireann connection agreement before starting. Comply with CDS Technical Documentation. Divert/build over services with Uisce Éireann approval. Maintain separation distances per Codes of Practice.Water Services
- 8Provide off-carriageway parking for construction traffic. Prevent muck/dirt on public road. Keep site neat with skips. Restrict noise/dust. No materials on public road/footpath without consent.Construction Management
- 9All removed material must be disposed of at licensed facilities by licensed operators.Environment Ecology
- 10Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays or Bank Holidays.Construction Management
- 11Relocate service poles prior to construction at applicant expense. All ESB/telecom cables must be located underground.Traffic Access
- 12Consult Chief Fire Officer and comply with fire safety requirements before starting.Compliance
Planning a project near Rickettstown South, Rathvilly, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Acbff9fc-bac0-41e4-a9df-8d7659b75665.pdf / Document 128963Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / F6b3a802-7042-45e1-b053-2535e473ad1a.pdf / Document 129342Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / F483e3b8-ba33-4e59-a043-345e524d4b85.pdf / Document 131289Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 0c524756-f413-4c23-8db5-29c2fa081c46.pdf / Document 128964Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 19174The erection of a low two storey/storey and a half type dormer dwelling, packaged wastewater treatment system and polishing filter, domestic garage and all associated site works / 0.4 km away / 07 November 2019Granted
- 19219(a) Retention of existing sunroom (22m2) to south elevation of existing two storey dwelling, (b) retention of existing detached one and half storey style dwelling (131.5m2) and all ancillary site works, and Planning Permission for (c) proposed new entrance, upgrade works to existing treatment system, all associated landscaping and all ancillary site works / 1.1 km away / 02 October 2019Granted
- 2395Change existing attic space of single storey bungalow to habitable space to house 2 no. bedrooms, bathroom and stairwell. Conversion of existing attached garage to habitable space and associated site works. Reconfiguration of existing ground floor accommodation in dwelling. Minor external elevational changes to include removal of one chimney breast, insertion of 2 no. gable end windows at 1st floor level, insertion of 3 no. Velux roof lights on front roof slope and insertion of 1 Velux roof light in rear roof slope. In addition, the changing from sliding door to window on front elevation and relocation of sliding double door on south-east facing gable. Upgrading existing septic tank and percolation area to a proprietary waste-water treatment system and a fully pumped soil polishing filter / 1.2 km away / 21 July 2023Granted
- 19391Construction of a machinery shed and all other associated site works. / 1.2 km away / 17 December 2019Granted
- 21125Retention planning permission for an attic conversion and single storey extensions to the side and rear of existing dormer style dwelling. Planning permission is also sought for a new waste water treatment system and percolation area and the termination of existing substandard septic tank and all associated site works / 1.4 km away / 24 August 2021Granted
- 21516To construct a storey and a half style dwelling, domestic garage, septic tank and percolation area, bored well, use of existing entrance and all associated works / 1.5 km away / 30 August 2022Granted
- 21521The erection of a single storey dwelling, proprietary wastewater treatment system and polishing filter together with all associated site works / 1.5 km away / 19 September 2022Granted
- 20379Permission for Single storey extension (floor area = 44.4m sq.) consisting of entrance lobby, link corridor and sunroom to rear and entrance porch (floor area - 1.8m sq) to front of existing low two storey dwelling together with all associated works / 1.6 km away / 11 December 2020Granted