Conditional grantDecided 03 July 2024Carlow County Council

2460024: A new two storey four bedroom dwelling, waste water treatment system, new site entrance plus all associated site works

Marley or Knockduff, Carlow, Co. Carlow
DecisionConditional grant
Decided03 July 2024
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons15conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 06/02/2024 as amended by FI response 10/06/2024.Compliance
  • 2Permission authorises only the development described in public notices and does not cover other unapproved site development.Compliance
  • 3Dwelling must be first occupied as permanent residence of applicants for 7 years. Section 47 agreement required before commencement. Occupation confirmation within 2 months.Occupancy
  • 4External finishes per Drawing 103PL. Roof blue/black or slate grey. No white UPVC for windows, doors or rainwater goods.Design Materials
  • 5Landscaping per Drawing 101 F.I. Retain existing trees/hedgerow. New planting in first season. Replace failures within 5 years.Landscaping Boundary
  • 6Sightlines at entrance/junction with R729 per Drawing 101 F.I. and DMRB. Road opening licence required prior to commencement.Traffic Access
  • 7Site entrance wing walls and piers height shall not exceed 1.2 metres.Design Materials
  • 8No interference with roadside drainage without Municipal District Engineer agreement. No surface water to public road/adjoining properties. Soakaways per BS 8301:1985 and BRE Digest 365. Only clean surface water to soakaways.Wastewater Drainage
  • 9Connection agreement with Uisce Éireann prior to commencement. Comply with CDS Technical Documentation. Diversion/build over approval required. Separation distances per Codes of Practice.Water Services
  • 10On-site WWT system per EPA Code of Practice (PE ≤ 10) 7th June 2021. Certificate of Compliance prior to occupation. Septic tank tested per I.S. EN 12566. Vents, max 6 distribution pipes, liquid levelling device, activated carbon filter, no surface water infiltration, grease trap.Wastewater Drainage
  • 11Off-carriageway parking for construction traffic. No parking on public road. Keep road clean. Maintain site neat/litter free. Noise/dust control. No materials on public road without consent.Construction Management
  • 12Construction hours: Mon-Fri 08:00-18:00, Sat 08:00-13:00. No Sundays/Bank Holidays.Construction Management