GrantedDecided 13 February 2025Carlow County Council
Along the Barrow Navigation in the townlands of: Newacre Clogrenan Killeeshal Ballinabrannagh Harristown Bestfield or Dunganstown Strawhall Ballygowan, Rathellin LeighlinbridgeMoneybeg Sliguff Ballyellin and Tomdarragh Ballyteigelea (Idrone East By)
Application description published by Carlow County Council.
Development will consist of essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Bank Revetment & Strengthening Works, (ii) Post-Flood Spot Dredging & Maintenance Dredging, (iii) Back-drain Maintenance, (iv) Small-scale Bank Repair Works, (v) Trackway Surface Upgrade Works, (vi) 10 no. Temporary Construction Compounds, (vii) Temporary mobile welfare units, and, (viii) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
322059-25Submitted 11 March 2025 / decided Not recorded
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
2460026
Received
07 February 2024
Decided
13 February 2025
FI requested
Yes
Authority
Carlow County Council
Application type
PERMISSION
Outcome
conditional
Source status
Reasons extracted from source documents
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
1No hydrocarbons from machinery to be disposed to groundwater or surface waters.Wastewater Drainage
2No wastewater from temporary mobile welfare units to be disposed to groundwater or surface waters.Wastewater Drainage
3No polluted water from temporary construction compounds to be disposed to groundwater or surface waters.Wastewater Drainage
4No polluted water from temporary construction compounds to be disposed to the public road network.Wastewater Drainage
5No interference with public road/footpath without consulting and agreeing with the Municipal Engineer.Traffic Access
6No interference with roads-related drainage without initial consultation and approval by the Municipal Engineer.Traffic Access
7No materials to be stored or deposited on the public road during works without prior consent of the Municipal Engineer.Traffic Access
8Public roads to be maintained free of muck and debris during construction works at all times.Traffic Access
9Any opening in adjacent public road/footpath requires a Road Opening License application per Guidelines for Managing Openings in Public Roads 2017.Traffic Access
10Machinery and lorries to be kept free of muck/debris; road sweepers to be used where debris is deposited on public roadways.Traffic Access
11CEMP to be submitted to Area Engineer prior to commencement of works.Construction Management
12Traffic Management Plans to be provided to and agreed with Area Engineer prior to works where relevant.Traffic Access
Planning a project near Along the Barrow Navigation in the townlands of: Newacre Clogrenan Killeeshal Ballinabrannagh Harristown Bestfield or Dunganstown Strawhall Ballygowan, Rathellin LeighlinbridgeMoneybeg Sliguff Ballyellin and Tomdarragh Ballyteigelea (Idrone East By)?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.