2460234: To construct a single storey dwelling, installation of a sewage treatment system and polishing filter, (all to EPA Code of Practice 2021) and associated site works
Kildavin, Co. Carlow, R21NT40
DecisionConditional grant
Decided16 April 2025
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons13conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Build in accordance with plans received 13/08/2024, amended by FI (06/02/2024) and clarification (31/03/2025).Compliance
- 2First occupation must be by applicant and immediate family as permanent residence for 7 years. Section 47 agreement required before works start.Occupancy
- 3External walls plastered in neutral colour. No white uPVC for windows/doors/rainwater goods. Ground levels per drawing 224.21.01A.Design Materials
- 4Landscaping per plan (31/03/2025). Plant in first season post-completion. Replace failures within 5 years.Landscaping Boundary
- 5Driveway must be unbound gravel. Sightlines per DMRB and drawing 224-21-07 established pre-construction. Gateway max 1.5m (timber/stone/plaster).Traffic Access
- 6Surface water to soakaways/system per BRE Digest 365. No discharge to public road or adjoining properties. Road opening licence required.Water Services
- 7Strict separation: clean surface water to soakpits, foul/soiled water only to wastewater system.Wastewater Drainage
- 8Wastewater system per EPA Code 2021. Certificate of Compliance pre-occupation. Min 10m percolation, 7m septic. I.S. EN 12566 testing. Grease trap. No surface water infiltration.Wastewater Drainage
- 9Off-carriageway parking for construction traffic. No road parking. Keep road clean. Control noise/dust. Maintain litter-free site.Construction Management
- 10Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No Sundays/Bank Holidays.Construction Management
- 11Relocate service poles prior to construction. All ESB/telecom cables underground unless otherwise agreed.Traffic Access
- 12Consult Chief Fire Officer prior to commencement and strictly comply with recommendations.Compliance
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 84fb7bce-7a74-4996-8c76-b2d603f909a0.pdf / Document 132016Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 52a8b80d-abc9-4394-8341-b32f635c4bcf.pdf / Document 132015Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / F2b2ab36-765d-430d-999e-9353023b329b.pdf / Document 133749Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 86daed91-cb0a-44d0-8ae9-7fffb97fa934.pdf / Document 122285Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 19414To construct an extension to the side of existing dwelling, upgrade of on site sewerage facilities and all associated site works / 0.2 km away / 10 December 2019Conditional grant
- 20425Erection of a dwelling house, domestic garage, domestic well, onsite waste water treatment system, percolation area and all associate site and landscaping works / 0.2 km away / 29 January 2021Conditional grant
- 19475To erect a dwelling house (including domestic car port and store), wastewater treatment plant and percolation area and all associated site works / 0.2 km away / 13 July 2020Conditional grant
- 2360284The as-built partial complete foundations. Permission is also sought for revisions to previously permitted permission PL21/349 to include revised house design, revised house location and Finish floor level / 0.4 km away / 29 January 2024Conditional grant
- 21349Permission to construct a part single storey, part two storey, split level dwelling, single storey garage, septic tank and percolation area, new bored well, new entrance pillars and wing walls in location of existing entrance and all associated site works / 0.4 km away / 08 February 2022Conditional grant
- 214931) permission to demolish existing dwelling in ruins and 2) construct a replacement dwelling on the same footprint with new on-site effluent disposal system, connection to public watermain & all associated site works / 0.5 km away / 15 February 2022Conditional grant
- 21404Construct a dwelling house with services, domestic garage & all associated site works / 0.5 km away / 28 February 2022Conditional grant
- 2272To construct a dwelling house with services, domestic garage and all associated site works, with new shared entrance to accommodate the proposed site and the existing agricultural field / 0.6 km away / 19 April 2022Conditional grant