Conditional grantDecided 18 October 2024Carlow County Council

2460256: The change of use of ground floor office space into a day care centre, including all associated internal alterations, minor alterations to the south façade and main entrance door to the west and all associated site works

Block Two The Waterfront, Mill Lane, Carlow
DecisionConditional grant
Decided18 October 2024
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons19conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 26/08/2024.Compliance
  • 2No further change or alteration of the building without prior planning permission.Compliance
  • 3Permission relates only to the development detailed in public notices.Compliance
  • 4Opening hours restricted to 08.00-18.00 Monday to Friday unless agreed otherwise.Occupancy
  • 5New access doors to match existing materials and finishes.Design Materials
  • 6No advertising signage, adhesive material on windows, or digital displays without prior agreement.Design Materials
  • 7No external security shutters; internal shutters must be single colour, open-grille or timber, and not used for advertising.Design Materials
  • 8No interference with roadside drainage; surface water to be collected and disposed of to soakways or site surface water system per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
  • 9Foul sewage, trade effluent, and soiled water to discharge to public foul system; only clean surface water to surface water system.Wastewater Drainage
  • 10No interference with adjoining public road/footpath without Municipal District Engineer agreement; Road Opening License required for any openings.Traffic Access
  • 11Sign Uisce Éireann connection agreement prior to commencement; comply with CDS Technical Documentation.Water Services
  • 12Provide off-carriageway parking for construction traffic; keep public road clean; maintain site litter-free; control noise/dust emissions.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.