2460310: The construction of a 2-storey detached townhouse dwelling, connection to existing site services and existing vehicular access road, provision of landscaping and boundary treatment works, and all associated and ancillary development works
Ard Bhile, Rathvilly, Cò. Carlow
DecisionConditional grant
Decided18 November 2024
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons14conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- , Development must follow submitted plans received 1 Oct 2024, specifically Site Layout Plan Drawing 24155-SPM-MFA-00-00-DR-A-501.Compliance
- , Permission is strictly limited to the development described in public notices and does not cover other site development.Compliance
- , External walls: self-coloured white smooth render (neutral colours). Roof: blue/black slates. No satellite dishes on front façade.Design Materials
- , Retain existing hit & miss fencing side/southern. Rear/western: 2m high plastered block wall. Side/northern: 2m high hit & miss solid fencing. Front/eastern: min 0.5m rail fencing, powder coated mild steel black or white.Landscaping Boundary
- , All ESB, telephone, and service cables must be underground. Relocate existing poles if necessary at applicant's expense.Other
- , Consult Chief Fire Officer and strictly comply with all fire safety requirements before development commences.Other
- , Take precautions to avoid damaging infrastructural services during construction. Make good any damage to Planning Authority's satisfaction.Construction Management
- , No surface water discharge onto public road/footpath/adjoining properties. Connect to existing surface water connection. Gutters/RWP must discharge within site, flush with building line.Wastewater Drainage
- , Sign Uisce Éireann connection agreement before commencement. Comply with Uisce Éireann standards. Divert/build over services requires written approval. Maintain separation distances per Uisce Éireann Codes.Wastewater Drainage
- , Limit construction noise/vibration to BS 5228-1:2009+A1:2014 and BS 5228-2:2009+A1:2014. Dust levels < 350 mm/m2/day over 30-day composite sample per VDI 2119.Construction Management
- , No construction traffic/parking on public road/footpaths. Keep roads/footpaths clean. No materials stored on public road/footpaths. Do not block roads. Segregate waste. Consult Tullow Municipal District Engineer before interfering with public road. Submit Road Opening Licence application for road/footpath openings.Traffic Access
- , Works must avoid noise/dust impairment beyond site boundary. All works within applicant's property unless written agreement from adjoining owners obtained and submitted to PA.Construction Management
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 961d7a4e-5c73-4e46-9e76-da9e22a4545e.pdf / Document 124421Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 821e1844-e8fb-442b-9d93-0b449b47bc23.pdf / Document 124420Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 3d68f4f1-d97a-4d21-b719-e52787378ff6.pdf / Document 126921Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 2ebcdf1d-6cce-4524-9bcd-688d99fa850c.pdf / Document 124422Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360250To retain existing two-storey dwelling house as constructed and retention planning permission is sought to retain domestic garage as constructed to the rear of existing dwelling house, all ancillary site works and services / 0.0 km away / 13 December 2023Conditional grant
- 2460420The construction of 27 no. dwellings consisting of 4no. three bed (2-storey) townhouses and 23no. four bed (2-storey) townhouses, connection to existing site services and completion of existing vehicular access road, provision of landscaping and communal open space, boundary treatment works, and all associated and ancillary development works / 0.1 km away / 24 June 2025Conditional grant
- 21246For the construction of 10 No. dwellings consisting of 3 No. three bed (2 storey) townhouses and 7 No. four bed (2 storey) townhouses, connection to existing site services and vehicular access road, provision of landscaping and communal open space, boundary treatment works, and all associated and ancillary development works / 0.2 km away / 09 June 2022Conditional grant
- 2460211Retention permission for the following, 1. alterations to previously granted granny flat Pl.No.01/563 to include ground floor & first floor extensions, the addition of 2. No. roof lights, changes to elevations and internal alterations. 2. Alterations to my existing dwelling to include a single storey extension to the rear elevation, changes to roof pitch & height, the construction of 2no. domestic sheds, a green house and all associated site works / 0.3 km away / 16 April 2025Conditional grant
- 21222Permission for the construction of a single storey extension to the Northwest elevation of existing dwelling and all associated site works / 0.4 km away / 03 August 2021Conditional grant
- 2360257Is sought to retain gym / home office building with storage ancillary to the use of the dwelling house as constructed to the rear of existing dwelling house all ancillary site works and services / 0.5 km away / 14 December 2023Conditional grant
- 22331To retain extension as constructed to the rear of existing dwelling house, to retain elevational alterations to the existing dwelling house as constructed, retention planning permission is sought to retain chalet as constructed to the rear of existing dwelling house as constructed, all ancillary site works and services / 0.5 km away / 17 May 2023Conditional grant
- 21196Permission for installation of new walking track floodlighting on lighting columns with associated light fixtures and all associated site work / 0.6 km away / 28 January 2022Conditional grant