GrantedDecided 27 February 2025Carlow County Council

Mardi, Tullow Road, Carlow

Planning application 2460348
DecisionConditional grant
Decided27 February 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons14conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Change of use from private residential house to Adult Day Care Centre. The proposal includes the following works: Demolition of front porch and the extensions on the east side of the house. New single storey extension to the rear. All associated site development and ancillary works.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with submitted plans/reports received 31 Oct 2024 and FI response 7 Feb 2025.Compliance
  • 2Permission authorises only the detailed development; does not cover other site development.Compliance
  • 3External walls: nap plaster, neutral colour. Roof: standing seam metal finish (flat) and selected membrane (pitched).Design Materials
  • 4Any signage/advertising structures require a separate planning application.Other
  • 5Strictly adhere to Traffic and Transport Assessment mitigation measures for access to N80 Tullow Road.Traffic Access
  • 6Landscaping per Hayes Ryan Landscape Architecture plans (7 Feb 2025). Continuous double-row hedging with deciduous trees. Planting in first season post-occupation; replace failures within 3 years.Landscaping Boundary
  • 7All ESB, telecommunications, and public services located underground. Relocate existing poles at applicant's expense.Other
  • 8Consult Chief Fire Officer and strictly comply with fire safety requirements prior to commencement.Compliance
  • 9Obtain road opening licence for public road/footpath works. Comply with 'Guidelines for Managing Openings in Public Roads (2017)' before development commences.Traffic Access
  • 10Install hydrocarbon interceptor, 20m3 attenuation tank, and hydrobrake within site boundary. Divert only clean surface water to soakaways per BRE Digest 365. Submit limited flow volume (l/s) for Planning Authority agreement.Wastewater Drainage
  • 11Sign Uisce Éireann connection/self-lay agreement prior to commencement. Comply with CDS Technical Documentation. Notify Uisce Éireann of change of use for billing.Water Services
  • 12No parking on public road/footpaths during demolition/construction. Keep adjoining roads/properties clean. Manage waste via licensed operators. Site vehicles must not block roads or cause nuisance.Construction Management

Planning a project near Mardi, Tullow Road, Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →