Conditional grantDecided 10 March 2025Carlow County Council

2560017: Refurbishment and Alterations to existing Cottage to consist of 4 bedrooms and bathroom,the refurbishment is to include the replacement of existing damaged roof.the construction of a new extension to the rear and side of the existing cottage, to include new kitchen, office, lounge and sitting room. the removal and replacement of existing septic tank with a new 3.5m3 tank. the install of a soakaway to the rear of the property to discharge surface rainwater. And all associated works.

Daisy Cottage, Maplestown Rathvilly, Co Carlow
DecisionConditional grant
Decided10 March 2025
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons11conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Development must follow approved plans received 25/01/2025.Compliance
  • , Permission limited to described development; excludes other exempted development.Compliance
  • , External walls, roof, and window finishes must match Drawing Ref. No. 01.Design Materials
  • , Demolition/construction waste disposed at licensed facilities by licensed operators.Environment Ecology
  • , Comprehensive wastewater conditions: Certificate of Compliance pre-occupation, EPA Code of Practice compliance, IS EN 12566 testing, clean surface water only to soakaways (BRE Digest 365), vent pipes, max 6 distribution pipes, activated carbon filters, grease trap, decommission existing tank.Wastewater Drainage
  • , Off-carriageway parking, road cleanliness, litter control, noise/dust limits, no road storage, engineer consent for road interference.Construction Management
  • , No surface water discharge to public road/adjoining properties. Aco-Drain at entrance required.Water Services
  • , Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No Sundays/Bank Holidays without written approval.Construction Management
  • , Consult Chief Fire Officer pre-commencement and comply with fire safety requirements.Compliance
  • , Service poles relocated pre-construction; all cables underground unless agreed otherwise.Compliance
  • , Development contribution of €262.80 payable pre-commencement. 5% p.a. interest applies after 90 days.Development Contribution