GrantedDecided 17 July 2025Carlow County Council

72 Tullow St., Carlow

Planning application 2560037
DecisionConditional grant
Decided17 July 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons10conditions8nearby records

Proposed development

Application description published by Carlow County Council.
The change of use of existing first floor office space to use as a habitable dwelling, and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received 17/02/2025, as amended by further information received 03/07/2025.Compliance
  • 2Permission is limited to the development described in public notices and plans received on 17/02/2025 and 03/07/2025.Compliance
  • 3Do not impair existing roadside drainage without Municipal District Engineer agreement. No surface water runoff to public road or adjoining properties. Connect surface water to existing site drainage within the curtilage.Wastewater Drainage
  • 4Do not interfere with public road/footpath without consulting Municipal District Engineer. Any opening requires a Road Opening License compliant with Guidelines for Managing Openings in Public Roads 2017.Traffic Access
  • 5Provide off-carriageway parking for construction traffic; no on-road parking. Prevent debris on public road. Maintain litter-free site. Limit noise/vibration per BS 5228 and dust to <350 mm/m2/day per VDI 2119. No materials on public road/footpath without Engineer agreement.Construction Management
  • 6Sign Uisce Éireann connection agreement prior to commencement. Comply with CDS Technical Documentation. Obtain written approval for diversions/build-overs. Maintain separation distances per Codes of Practice. Subject to Capital Investment Plan constraints.Water Services
  • 7Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays & Bank Holidays. Deviations require prior written approval from Carlow County Council.Construction Management
  • 8All material removed during demolition/construction must be recovered/disposed of at licenced facilities and transported by licenced operators.Environment Ecology
  • 9Consult Chief Fire Officer prior to commencement and strictly comply with recommendations.Compliance
  • 10Pay development contribution of €1,111.50 within one month of permission date. Interest at 5% p.a. applies after 90 days. Calculation: Urban Residential (85.5m² @ €42) less Commercial (85.5m² @ €29).Development Contribution

Planning a project near 72 Tullow St., Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →