2560068: A quarry development, at Coolnapish, Bagenalstown, Co. Carlow on behalf of Milford Quarries Ltd., comprising of: (a) The excavation of 114,000 m3 of sand and gravel (no processing), over an extractive area of 2.11-hectares at an average annual rate of circa 40,000 tonnes, over a 5-year period (i.e. circa 190,000 tonnes overall). (b) Construction of a new splayed entrance and access road. (c) Construction of a perimeter berm within a 5m-wide strip immediately adjacent to and outside the extractive area, all within the overall development area of 2.49-hectares. (d) Construction of a wheelbath. (e) All associated site works and services to facilitate the development. A five-year term is sought for extraction and an overall development period of eight years is sought to allow for preparatory site works and completion of restoration works. A Natura Impact Statement has been prepared in respect of the proposed development and is submitted with the Application
Coolnapish, Bagenalstown, Co. Carlow
DecisionRefused
Decided24 April 2026
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons8conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Wheel wash shall not disperse silty or polluted water to ground or surface waters.Wastewater Drainage
- 2Wheel washing system shall be a closed loop requiring only small daily top-up from a bowser.Wastewater Drainage
- 3No surface water from development shall be dispersed onto the public roadway.Wastewater Drainage
- 4Access roads to be constructed of permeable material and cambered towards edge filter drains.Traffic Access
- 5Filter drains to disperse surface water to ground within the site curtilage.Wastewater Drainage
- 6Surface water disposal systems to be designed and maintained per the Greater Dublin Strategic Drainage Study.Wastewater Drainage
- 7No surface water from development shall be dispersed to surface waters.Wastewater Drainage
- 8Construction Environmental Management Plan (November 2025) to be fully implemented.Construction Management
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / F801b387-d043-41e6-a770-6fc1ea0ba926.pdf / Document 149733Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / C684cc66-706e-464d-9a99-74c5fdbe049a.pdf / Document 149732Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / Ad98a334-0048-40ac-b9fb-8784854aa553.pdf / Document 149905Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 890fc9e6-23b5-4bd2-9c68-325b9e59908b.pdf / Document 133284Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360184Retention permission for the following, 1. The construction of a single storey extension to an existing domestic garage, 2. the unauthorised change of use of the afore mentioned domestic garage to use as a habitable dwelling, 3. the unauthorised installation of a septic tank & percolation area, 4. the construction of a domestic store and a boiler house, and all associated works / 1.5 km away / 11 October 2023Refused
- 19329Permission for storey and a half style extension to an existing dwelling, internal and external alterations to same dwelling and all associated site works / 2.7 km away / 03 March 2020Refused
- 2360159The development will consist of the extension of the operational lifespan of a solar farm permitted by Carlow County Council under Planning Reg. 22/118 from 35 No. years as permitted (by reason of condition No. 3 of permission Planning Reg. 22/118) to 40 No. years. / 2.8 km away / 25 September 2023Refused
- 2560349The construction of a single storey dwelling, wastewater treatment system, a bored well, extend existing access lane and upgrade entrance and all associated site development works / 2.9 km away / 08 January 2026Refused
- 18333For the construction of a dormer type dwelling, domestic garage, septic tank & percolation area, new entrance, bored well and all associated site works / 3.2 km away / 04 April 2019Refused
- 18407For the demolition of existing rear extension and for the construction of a rear extension, proprietary effluent waste water treatment system, polishing filter and ancillary services associated with same / 3.3 km away / 23 May 2019Refused
- 19344The construction of a bungalow style dwelling, domestic garage, connection to public foul sewer, connection to public watermain and all associated site development works / 3.8 km away / 24 October 2019Refused
- 2560074The construction of a 3-storey block of apartments comprising 2no. 1beds & 4no. 2beds, new entrance, onsite parking, connection to mains water, public sewer & stormwater and all associated site development works / 4.0 km away / 19 May 2025Refused