GrantedDecided 29 October 2025Carlow County Council

Orchard, Leighlinbridge, Co Carlow

Planning application 2560268
DecisionConditional grant
Decided29 October 2025
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons11conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Construct a single storey extension to the side of existing single storey dwelling, demolition of existing sun room to the rear and existing detached garage, new percolation area and waste water treatment system, use of existing on site services, use of existing entrance and all associated site works at Orchard, Leighlinbridge, Co. Carlow. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted with the Application

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received on 5 September 2025.Compliance
  • 2Permission is limited to the development described in public notices and submitted plans.Compliance
  • 3Mitigation measures in the Natura Impact Statement (NIS) must be strictly adhered to and implemented.Environment Ecology
  • 4External wall and roof finishes must match the existing dwelling per annotated elevational drawings PL:008-T&DC-25.Design Materials
  • 5No impairment of existing drainage; surface water disposed of to on-site soakaways per BRE Digest 365; no discharge to road or adjoining properties.Wastewater Drainage
  • 6Provide off-carriageway parking for construction traffic; prevent muck/debris on public road; maintain neat site; control noise and dust.Construction Management
  • 7Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays.Construction Management
  • 8WWT system and percolation area must comply with EPA Code of Practice 2021. Submit Certificate of Compliance prior to occupation. Decommission existing septic tank and percolation area.Wastewater Drainage
  • 9Sign connection agreement with Uisce Éireann prior to commencement and comply with CDS Technical Documentation.Water Services
  • 10Fire brigade vehicle access and water supplies must comply with Chief Fire Officer requirements.Traffic Access
  • 11Pay development contribution of €219.36 prior to commencement, plus interest at 5% per annum from grant date.Development Contribution

Planning a project near Orchard, Leighlinbridge, Co Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →