GrantedDecided 04 November 2025Carlow County Council

Circle K Service Station, Junction 5 on the M9 Motorway, Rathcrogue

Planning application 2560281
DecisionConditional grant
Decided04 November 2025
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons12conditions8nearby records

Proposed development

Application description published by Carlow County Council.
A high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 18no. electric vehicle charging bays and 9no. charging points, (ii) Installation of new canopy with associated illuminated signage (iii) new modular ESB Substation, (iv) new EV banner signage, (v) signature wall (vi) associated revisions to existing landscaped area including removal of existing trees and vegetation, and existing lighting columns, new road markings and, (vi) all other associated drainage and site development works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development shall be carried out in accordance with plans received by the Planning Authority on 15/09/2025.Compliance
  • 2Permission authorises only the development detailed in the submitted plans and particulars.Compliance
  • 3External finish materials, colours, and textures must be submitted and agreed in writing prior to commencement.Design Materials
  • 4No additional signage or advertisement structures shall be erected unless authorised by a further grant of planning permission.Design Materials
  • 5Do not impair existing land/roadside drainage without Municipal District Engineer agreement. All surface water must be collected and disposed to the site surface water system.Wastewater Drainage
  • 6Submit a detailed Construction and Environmental Management Plan (CEMP) for written agreement prior to commencement, covering site compounds, traffic routing, noise/dust mitigation, waste, and archaeological constraints.Construction Management
  • 7Prepare a Resource Waste Management Plan (RWMP) per EPA Best Practice Guidelines (2021) and agree it with the Planning Authority prior to commencement.Environment Ecology
  • 8Construction traffic/parking/noise/dust controls: off-carriageway parking only, no public road parking, debris prevention, BS 5228 noise/vibration limits, VDI 2119 dust limits (<350 mm/m2/day), no materials on public roads without Engineer agreement.Construction Management
  • 9Do not interfere with public road/footpath without Municipal District Engineer agreement. Submit a Road Opening License application for any required openings per 2017 Guidelines.Traffic Access
  • 10Erect appropriate warning signage during construction for road users, public, and pedestrian safety.Traffic Access
  • 11Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays or Bank Holidays without prior written approval.Other
  • 12Consult the Chief Fire Officer prior to commencement and strictly comply with his recommendations.Compliance

Planning a project near Circle K Service Station, Junction 5 on the M9 Motorway, Rathcrogue?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.