Ballinree, Borris, Co. Carlow
Planning application 2560335
DecisionConditional grant
Decided15 December 2025
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received 31/10/2025, except where altered by conditions.Compliance
- 2Permission authorises only the development described in public notices and received plans; does not cover other unauthorised development on site.Compliance
- 3Dwelling must be first occupied as permanent residence by applicants and immediate family for 7 years. Section 47 Agreement required prior to commencement. Certificate of first occupation due within 2 months. Sale by mortgagee in possession or consent for occupation by others of same category permitted.Occupancy
- 4External walls, roof and window finishes per Drawing J1015-PL02-001. Stone finish must be natural stone only. White uPVC prohibited for windows, doors or rainwater goods.Design Materials
- 5Garage for private domestic use only, incidental to dwelling enjoyment. No commercial, trade, industrial purposes, housing animals or human habitation. Roof pitch must match dwelling.Other
- 6Landscaping retained/maintained per Drawing J1015-PL01-001. New planting native species. Hedgerow along realigned roadside boundary min 4-5 years growth at planting. Completed within first planting season post-construction, replaced if failure occurs.Landscaping Boundary
- 7Certificate of Compliance for on-site wastewater system and percolation area required prior to 1st occupation. Designed per EPA Code of Practice 2021. Septic tank tested per I.S. EN 12566. Vents at percolation pipe ends. Max 6 distribution pipes from single box. Pipe seals and liquid levelling devices required. Grease trap installed.Wastewater Drainage
- 8Road Opening Licence required for any opening in public road/footpath per Guidelines 2017. No interference without licence. No materials on public road without consent. No surface water runoff to road/properties. Surface water collected in soak pits per BRE Digest 365.Traffic Access
- 9Adequate off-carriageway parking for all construction traffic. No parking on public road. Prevent muck/dirt/debris on adjoining road. Site kept neat and litter free. Noise/dust emissions must not impair amenities beyond site boundary. No materials on road without consent.Construction Management
- 10Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No activity on Sundays & Bank Holidays. Deviations require prior written approval.Construction Management
- 11Applicants must consult Chief Fire Officer and strictly comply with any fire safety requirements prior to development.Compliance
- 12Service poles relocated prior to construction at applicant expense. All ESB, telephone cables and service lines located underground except as otherwise agreed.Other
Planning a project near Ballinree, Borris, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 8f9be7b7-e3f7-4b88-b6c6-43005c1d10a7.pdf / Document 144073Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 8455a271-d0b9-40c0-adbb-67d784ff2313.pdf / Document 144072Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / B4886e7a-d3c1-4036-8525-20b919aa8835.pdf / Document 145607Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 18209Demolition of the existing single storey wood-turning workshop and storage buildings; alterations to the existing wastewater treatment system; construction of a new single storey wood turning workshop and study centre with ancillary storage buildings plus all associated landscaping, site works and signage. / 0.4 km away / 17 August 2018Granted
- 21462For the erection of a new wood store shed and all associated site and landscaping works / 0.4 km away / 27 January 2022Granted
- 22397The construction of a Single Storey Dwelling, detached garage, septic tank & percolation area, bored well, splayed entrance and all associated site development works / 0.7 km away / 23 March 2023Granted
- 18232The construction of a two storey dwelling, single storey garage, bored well, wastewater treatment system and all associated site works / 0.8 km away / 11 December 2018Granted
- 2460239The construction of a single-storey dwelling, associated effluent treatment plant and percolation area, erection of new site boundaries, construction of a new vehicular entrance and roadside boundary set-back together with all associated site development works / 0.9 km away / 27 February 2025Granted
- 2360299The erection of a dwelling house, garage, installation of a treatment plant and percolation area and all associated site works / 1.1 km away / 16 February 2024Granted
- 2560028To construct a single storey dwelling, garage, on site wastewater treatment system, percolation area, bored well, new domestic splayed entrance and driveway and all associated site development works / 1.1 km away / 16 May 2025Granted
- 18399For the construction of a dormer style dwelling, appropriate waste water treatment system, bored well, new entrance and associated wing walls, domestic garage, and all ancillary site works / 1.2 km away / 11 December 2018Granted