GrantedDecided 06 May 2026Carlow County Council

Monastery Court, New Chapel Lane, Tullow

Planning application 2560368
DecisionConditional grant
Decided06 May 2026
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons16conditions8nearby records

Proposed development

Application description published by Carlow County Council.
The construction of 2 no. single storey, semi-detached, 2 bedroom dwellings with connections to existing public services and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development carried out in accordance with plans/reports received 14 Nov 2025, FI responses 9 Feb 2026 and 9 Apr 2026. Layout per Site Plan TCCE-2024-005-PL-002.Compliance
  • 2Engage qualified archaeologist to monitor all site clearance/groundworks. Cease works if remains identified pending PA decision. Submit final archaeological report. CEMP to describe mitigation.Archaeology Heritage
  • 3Permission authorises only development described in public notices and reports.Compliance
  • 4External wall finishes: cement render coloured white on all elevations. Roof: blue/black tiles/slates with matching ridge tiles. Flat roof canopies: zinc finish. No satellite dishes on front façade.Design Materials
  • 5Boundary treatment: timber post and rail fencing on northern/southern boundaries. Front curtilages: 0.8m post and rail. Rear curtilages: 2.1m concrete post and panel fencing.Landscaping Boundary
  • 6Existing stone wall at rear boundary retained in full. Repairs/re-pointing per Structural Survey Report by TAGROUP (April 2026).Design Materials
  • 7All ESB, telephone cables, service lines located underground. Relocate existing poles if necessary at applicant's expense.Other
  • 8Consult Chief Fire Officer for fire safety requirements prior to commencement.Compliance
  • 9Adopt precautionary measures to avoid damage to infrastructural services traversed by vehicles/machinery. Make good any damage to satisfaction of PA.Construction Management
  • 10Surface water runoff not to discharge onto public roads/footpaths/adjoining properties. Divert only clean surface water to soakaways within site per BRE Digest 365. Locate gutters/RWP to discharge within site.Wastewater Drainage
  • 11Sign Uisce Éireann connection agreement for each dwelling prior to commencement. Comply with Uisce Éireann standards. Diversion/build over requires written approval. Maintain separation distances per Codes of Practice.Water Services
  • 12Limit noise/vibration to BS 5228-1:2009+A1:2014 and BS 5228-2:2009+A1:2014. Limit dust to <350 mm/m2/day per VDI 2119.Construction Management

Planning a project near Monastery Court, New Chapel Lane, Tullow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.