GrantedDecided 01 April 2026Carlow County Council

Kellistown East, Co.Carlow, R93NT98

Planning application 2560372
DecisionConditional grant
Decided01 April 2026
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons14conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Proposed alterations to existing dwelling, erection of a single-story extension and two-storey extension, erection of a domestic garage, and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with approved plans received 17/11/2025 and amended 09/03/2026.Compliance
  • 2Permission limited to development described in public notices and application plans.Compliance
  • 3Garage to be used solely incidental to dwelling enjoyment, not as self-contained unit or for business.Compliance
  • 4External finishes of extension to match existing house per submitted elevational drawings.Design Materials
  • 5Do not impair land/roadside drainage; surface water not to discharge to road or adjoining properties; soakaways per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
  • 6On-site wastewater system per EPA Code of Practice 2021; Certificate of Compliance required prior to occupation; existing septic tank decommissioned; grease trap installed.Wastewater Drainage
  • 7Surface water diverted to soakaways within curtilage per BRE Digest 365 with 20% climate change allowance; aco drain at entrance to prevent road discharge.Wastewater Drainage
  • 8Construction managed per CEMP and RWMP, available for inspection on site.Construction Management
  • 9Measures to prevent spread of Alien Invasive Species during construction per NRA guidelines.Environment Ecology
  • 10Off-carriageway parking for construction traffic; no road parking; keep road clean; noise/dust control; no materials on road without consent.Traffic Access
  • 11Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00; no Sundays or Bank Holidays.Construction Management
  • 12Service poles relocated prior to construction; all cables underground.Traffic Access

Planning a project near Kellistown East, Co.Carlow, R93NT98?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →