Main Street, Borris, Co Carlow
Planning application 2660057
DecisionConditional grant
Decided21 April 2026
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons8conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development shall be carried out in accordance with plans received by the Planning Authority on 27/02/2026, except where altered by conditions.Compliance
- 2Permission authorises only the development described in public notices and plans received; does not relate to any other development on the site.Compliance
- 3External finishes, windows, doors, and rainwater goods to match existing house per submitted elevations. Corrugated sheeting to be dark colour (blue/black or dark grey) matt finish unless otherwise agreed.Design Materials
- 4Development shall not impair existing land/roadside drainage. No surface water runoff to public road or adjoining properties. Only clean surface water and wastewater from development to be diverted to existing networks within site curtilage.Wastewater Drainage
- 5Adequate off-carriageway parking for all construction traffic. No parking on public road/footpath. Prevent muck/debris on public road. Maintain neat/litter-free site. Control noise/dust emissions. No materials on public road without agreement. Removed material disposed at licensed facilities.Construction Management
- 6Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays or Bank Holidays.Construction Management
- 7Consult Chief Fire Officer prior to commencement and strictly comply with any fire safety requirements relating to the development.Compliance
- 8Development contribution of €540.00 to be paid prior to commencement, with interest at 5% p.a. from grant date to payment date (first 90 days discounted).Development Contribution
Planning a project near Main Street, Borris, Co Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 65b9bd90-da31-4514-87c7-c31ac34e21a6.pdf / Document 149538Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 71830f72-6407-44de-8ee8-f7d00c176b6a.pdf / Document 149537Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 846817af-18ca-4cb0-aefe-92b94e3eae9a.pdf / Document 152181Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / F6e6e546-bdf5-42b1-a14b-1e1bcb139308.pdf / Document 149589Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 18290Retention permission for the construction of a two storey building used for a coffin store, hearse parking and first and second floor storage, the construction of a gazebo and all associated site works / 0.0 km away / 30 July 2019Granted
- 2360191To demolish existing extension and shed to the rear of the dwelling and permission for the erection of an extension at the rear of existing dwelling and all associated site works / 0.1 km away / 01 May 2024Granted
- 18213Permission for the change of use of existing storage area to the rear of existing shop to a one bed apartment and all associated site works. / 0.1 km away / 10 September 2018Granted
- 20301For alterations to previously approved planning permission No. 18/103 which will consist of the following - modification of dwellings 8 and 9 from 1 bedroom units to 2 bedroom units and all associated site works / 0.1 km away / 19 October 2020Granted
- 19423Material alterations to previous planning permission 18/103 to consist of modifications to site entrance and connection to surface water mains and all associated site works and permission for the conversion of existing stone store building to 2 no. apartments and all associated site works / 0.1 km away / 02 April 2020Granted
- 18103Phase 1: permission to a) To demolish the existing unauthorised flat roof extension to the rear if the existing public house b) demolish the existing stone shed to the rear of the property c) conversion of existing rear section of public house to a two bed apartment, d) change of use and alterations of existing public house to a retail/commercial unit, e) alteration to existing habitable accommodation associated with existing public house to convert to a self-contained three bed apartment, and Phase 2: permission for f) conversion of existing stone store to a one bed apartment and alterations to existing street facade i.e. new door and windows, g) the erection 9 no. dwelling units consisting of a mixture of two and three bed, h) change of use to existing stone building to the rear to 2 no. one bed cottages and erection of extension to the rear of each cottage, I) widen the existing entrance, proposed new access road or service the sites, connection to existing services and all associated site works. / 0.1 km away / 14 March 2019Granted
- 21372Alterations to previously approved planning permission reference 18/103 which will consist of the following - modified design to rear of site consisting of new design layout with 8 no. 2-bedroom bungalows to replace the 5 no. 2-storey terrace dwellings and all associated site works. / 0.1 km away / 16 March 2022Granted
- 2560300Alterations to the existing vehicular entrance to the Borris WWTP off the R702 and planning permission for the proposed widening of the existing entrance, associated revised entrance arrangement including reinstatement of piers and gates, and all associated site development works above and below ground / 0.2 km away / 24 November 2025Granted