Clonervy, Poles, Co Cavan
Planning application 1853
DecisionConditional grant
Decided22 March 2018
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons9conditions8nearby records
Proposed development
Application description published by Cavan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received 6 Feb 2018.Compliance
- 2Pay €6,310 (CPI updated at time of payment) to the Planning Authority for public infrastructure.Development Contribution
- 3First occupation must be by applicant/immediate family/heirs as primary residence for 7 years.Occupancy
- 4Entrance set back 4m, max width 8m, gates max width 4m, height max 1.2m, rural finishes, completed before occupation.Traffic Access
- 5Entrance area drainage piped under entrance (min 225mm), graded 5%, grass verge retained, macadam finish, no surface water onto road.Traffic Access
- 6No surface water from roofs/paved areas shall flow onto the adjoining road.Water Services
- 7Install proprietary treatment system with polishing filter per EPA Code of Practice, annual maintenance contract, certification prior to occupation.Wastewater Drainage
- 8Retain sound trees, landscape with native species only, replace failures within two seasons.Landscaping Boundary
- 9Garage strictly for non-habitable domestic/private use; no commercial/industrial/business purposes.Compliance
Planning a project near Clonervy, Poles, Co Cavan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 18 pages of searchable text on file.Chief Executives Order4 pages indexed
CAVAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS 2000 to 2015 Chief Executive's Order No: PL 97,698 Reference Number: 18/53 Name of Applicant: Ryan McCabe Address: C/o Andrew O'Gorman Building Surveyor Drumbo Cavan Co Cavan Nature of Application: PERMISSION to construct fully serviced dwelling and detached domesuc...
Final Grant4 pages indexed
r ) PLANNING AND DEVELOPMENT ACT 2000 - 2015 NOTIFICATION OF FINAL GRANT COUNCIL OF THE COUNTY OF CAVAN TO: Ryan McCabe C/o Andrew O'Gorman Building Surveyor Drumbo Cavan Co Cavan Pianning Register Number: 18/53 Application Receipt Date: 06/02/2018 Further Information Received Date: Council have by Order dated...
Planners Report10 pages indexed
C av an Pl an ni ng Au th o rit y -I ns pe ct io n Pu rpo se s O nl y!
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 3 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: cavancoco.eplanning.ie / 6c3c0841-bf97-4d7e-bf6e-b818773e023b.PDF / Document 312238Source PDF
- Final GrantSource: cavancoco.eplanning.ie / De3c2770-fa30-4f75-8b1c-f4c6650cb1ce.PDF / Document 313814Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / F66fd0bd-bf9a-4b82-88f0-a8b7139d3078.PDF / Document 312232Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 179To construct single storey granny flat to side of existing two storey house and to upgrade existing percolation area and RETENTION PERMISSION is sought to retain (1) single storey extension constructed to side of existing two storey house (2) single storey agricultural buildings consisting of stables and tack room store and complete all associated and ancillary site works / 0.3 km away / 29 May 2017Granted
- 21567For the construction of 1 no. fully serviced, single storey dwelling with new sewage treatment system & percolation area, connection to existing well, new entrance walls and piers to existing lane and all associated ancillary site works / 0.6 km away / 01 November 2021Granted
- 22349To construct detached dwelling, detached domestic garage, incorporate wastewater treatment system/ percolation area, entrance walls and piers and carry out associated site works / 0.7 km away / 19 October 2022Granted
- 2212Conversion of existing attached store and domestic garage to a granny flat / 0.7 km away / 09 March 2022Granted
- 19295Of (a) change of use of existing detached domestic garage to commercial use, (b) retain single storey extension to rear of same, (c) retain & complete single storey extension to side of same and (d) retain existing detached domestic fuel store with all associated and ancillary works / 0.7 km away / 23 September 2019Granted
- 17309To erect a part two storey, part single storey dwelling, detached domestic garage, proposed new entrance to public road, entrance gates and piers, waste water treatment system with percolation area and all associated site works / 0.7 km away / 28 August 2017Granted
- 1878To partly demolish and convert existing uninhabited dwelling to detached domestic garage. Permission also sought to erect fully serviced two-storey dwelling, entrance, sewerage treatment facilities and all ancillary works / 0.8 km away / 20 August 2022Granted
- 21149Retain single storey lean to extensions to rear of existing dwelling and all associated works / 0.8 km away / 07 May 2021Granted