Kilbride, Mountnugent, Co. Cavan
Planning application 1877
DecisionConditional grant
Decided29 March 2018
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons6conditions8nearby records
Proposed development
Application description published by Cavan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received 21 Feb 2018.Compliance
- 2Garage restricted to non-habitable ancillary domestic/private use; commercial/industrial/business use prohibited.Occupancy
- 3Brochure/sample of external finish to be submitted for approval before works commence.Design Materials
- 4External roof finish of extension must match existing dwellinghouse.Design Materials
- 5€1,230 development contribution payable within 3 months of permission date.Development Contribution
- 6No surface water to discharge onto adjoining road; must be collected by surface water drainage system.Wastewater Drainage
Planning a project near Kilbride, Mountnugent, Co. Cavan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 9 pages of searchable text on file.Chief Executives Order1 page indexed
CAVAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS 2000 to 2015 Chicf Executive's Order No: PL 97,722 Reference Number: 18/77 Name of Applicant: Shane & Kay Smith Address: C/o James Brody Callanagh Kilcogy Co Cavan Nature of Application: PERMISSION to erect single storey extension to front of existing bungalow...
Final Grant3 pages indexed
ee PLANNING AND DEVELOPMENT ACT 2000 - 2015 NOTIFICATION OF FINAL GRANT COUNCIL OF THE COUNTY OF CAVAN TO: Shane & Kay Smith C/o James Briody Callanagh Kilcogy Co Cavan Planning Register Number: 18/77 Application Receipt Date: 21/02/2018 Further Information Received Date: In pursuance of the powers conferred upon them...
Planners Report5 pages indexed
MEMORANDUM From Gary Farrelly Assistant Planner To Nicholas O’Kane Senior Planner OP LIA 7 7 Date 29" March 2018 Planning Reg. No: Applicant: Type of Application: Development Description: Engineering Area: Site Location 18/77 Shane & Kay Smith Permission To erect single storey extension to front of existing bungalow...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 3 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: cavancoco.eplanning.ie / 10d67777-040c-4049-b2c3-ffc49f5c9b94.PDF / Document 312338Source PDF
- Final GrantSource: cavancoco.eplanning.ie / Cff86f3f-7ac2-4fcd-8d5f-bb71bbe6cfc6.PDF / Document 313796Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / C3860d25-3a04-4465-970d-5e3a8bff3d31.PDF / Document 312332Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 23173Retain alterations to floor plans and elevations of previously approved planning permission (reference 17/450) and all associated and ancillary works / 0.1 km away / 30 May 2023Granted
- 17450To erect fully serviced dormer type dwelling over domestic basement garage, entrance, sewerage treatment facilities and all ancillary works / 0.1 km away / 01 December 2017Granted
- 22324(1) To retain existing two storied dwelling constructed to date under planning reference 11/179 and change of use of integrated garage to living accommodation (2) To complete the construction of a two storied dwelling house previously granted under planning ref. 00/1609 and such building works as was completed and retained under planning ref: 11/179 (3) To install a proprietary waste water treatment unit and percolation (4) To complete all ancillary site works including entrance and boundary treatment works (5) To construct a detached domestic garage. / 0.4 km away / 20 September 2022Granted
- 23210To retain the following: 1) alterations to site boundaries, 2) alterations to elevations to existing domestic garage, 3) alterations to front elevation & to side elevations and alterations to chimney position to front elevation of existing two storey dwelling (previous approved planning reg- 05/1846 relates) / 0.5 km away / 12 July 2023Granted
- 18419To erect fully serviced dormer style dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works / 1.0 km away / 16 November 2018Granted
- 2151Construct new agricultural machinery entrance and all associated site works / 1.0 km away / 31 March 2021Granted
- 17458To construct new entrance walls, piers and all associated site works / 1.1 km away / 11 December 2017Granted
- 2560086To construct a single storey extension to the rear of existing single storey detached dwelling, new entrance porch, alterations to existing elevations, internal alterations, landscaping, and associated site works / 1.1 km away / 24 April 2025Granted