Freeduff, Kilcogy, Co. Cavan
Planning application 2025
DecisionConditional grant
Decided25 September 2020
Application typePERMISSION
Source documents7
Site
What is on file
0refusal reasons5conditions8nearby records
Proposed development
Application description published by Cavan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with plans submitted 29 January 2020, as amended by further plans submitted 4 September 2020.Compliance
- 2External finishes shall complement the existing dwelling.Design Materials
- 3Existing septic tank and percolation area to be decommissioned once the new wastewater treatment system is installed and commissioned.Wastewater Drainage
- 4Sewage system per EPA Code of Practice (2009) and Irish Agrément Certification. Prior to occupation: annual maintenance contract, supplier installation confirmation, and percolation area construction certification by a qualified professional.Wastewater Drainage
- 5Uncontaminated surface run-off from roofs and clean paved areas to be collected, managed and discharged per submitted plans.Water Services
Planning a project near Freeduff, Kilcogy, Co. Cavan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 26 pages of searchable text on file.Included in site brief
7 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 6 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
7 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- 20435For domestic garage/store and all associated works / 0.3 km away / 27 May 2021Granted
- 2560051To; (i) install new sewerage treatment system & percolation area, (ii) to construct detached domestic garage, (iii) with connection of the proposed detached domestic garage and existing dwelling house to existing services, and all associated site works / 1.0 km away / 11 June 2025Granted
- 19225EXTENSION OF TIME 14/152 to construct 1 no. agricultural machinery/general purpose store together with all ancillary structures and all associated site works / 1.0 km away / 18 July 2019Granted
- 2331To construct new silage slab with concrete apron, ancillary concrete and ancillary site works / 1.1 km away / 23 March 2023Granted
- 2560211To construct new machinery storage shed and ancillary site works / 1.1 km away / 20 June 2025Granted
- 18112For change of house type previously granted under planning ref. no. 08/1002 & retention of living accommodation erected to rear & retention of domestic extension to include kitchenette & changing area and shower room at rear with connection to all existing services / 1.2 km away / 01 June 2018Granted
- 21764To erect new dwelling house, domestic garage, entrance, boundary walls, piers with connection to Kilcogy town foul sewer and associated works / 1.2 km away / 25 May 2022Granted
- 17464To convert attic space of existing dwelling to first floor living accommodation and all ancillary works and to retain existing dormer windows to front elevation / 1.5 km away / 18 December 2017Granted