Rantavan, Mullagh, Co Cavan
Planning application 21363
DecisionConditional grant
Decided04 August 2021
Application typeEXTENSION OF DURATION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cavan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rantavan, Mullagh, Co Cavan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 3 pages of searchable text on file.Chief Executives Order1 page indexed
CAVAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS 2000 to 2020 Chief Executive's Order No: PL 101,363 Reference Number: 21/363 Name of Applicant: Liam Daly Address: C/o Alan Clarke ATC Building Surveying & Engineering Consultancy Unit 2 Dublin Road, Kingscourt Co. Cavan Nature of Application: EXTENSION OF DURATION of...
Planners Report2 pages indexed
MEMORANDUM From Eve Harrison To Nicholas O'Kane Executive Planner Senior Planner jon Ligh. Date 29"" July 2021 Applicant: Liam Daly Planning Reg: 21/363 Type of Application: Extension of duration of appropriate period in accordance with Section 42 of the Planning and Development Act 2000 (as amended). Engineering...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 2 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: cavancoco.eplanning.ie / 4c7d2097-0b57-482e-8519-383a335c5087.PDF / Document 360311Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / 008d1827-4e42-4144-9a80-db126acd7154.PDF / Document 360313Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360046For the construction of a livestock underpass, effluent holding tank and all ancillary site development works / 0.3 km away / 08 September 2023Granted
- 23197Demolition of existing wall to the external yard area to the front of the building and the construction of an increased external animal pen area to the front of the building, to include a new wall to the sides and new metal sloping roof over, there are no alterations to the existing building or the existing building services or drainage installations / 0.4 km away / 03 July 2023Granted
- 20486To (a) retain the removal of roadside hedgerow and PERMISSION to (b) remove the unauthorised entrance and part of existing unauthorised driveway (c) form a new entrance onto public road and erect new piers, wing walls and roadside boundary together with 4m layby (d) remove/block up the original entrance to the property together with all associated walls, piers etc. (e) carry out all associated site works / 0.4 km away / 21 December 2020Granted
- 2380Construct agricultural shed and all ancillary site development works / 0.4 km away / 17 April 2023Granted
- 18508To construct 4 no. semi-detached single storey dwellings together with all associated site works, including connections to public foul drainage system and watermain at existing housing development / 0.5 km away / 01 February 2019Granted
- 17413For development which will consist of the placement of 1 no. prefabricated steel container for the purpose of general storage, and all associated site development works at parish owned grounds adjacent to rear church carpark / 0.7 km away / 01 November 2017Granted
- 1817To (a) change the use of vacant primary school to use as a community facility for various organisations/community facility for various organisations/community groups associated with the parish of Mullagh including Mullagh Tourism and Development Committee, Mullagh Parochial Committee and Mullagh Mens Shed, (b) construct a detached storage building to the rear of the existing school building, (c) together with all associated site works / 0.7 km away / 05 March 2018Granted
- 2360035To construct a 4 bed type Bungalow,Domestic Garage, To upgrade existing entrance on the main road to access a laneway leading to a new proposed private entrance to access proposed site also new BAF Sewage Treatment System with percolation area and with all ancillary site works. Note: the existing entrance enters the townlands of Rantavan & Cloghbally Upper / 0.8 km away / 19 July 2023Granted