GrantedDecided 14 December 2017Clare County Council

Fintra More, Cloonbony, Miltown Malbay

Planning application 17660
DecisionConditional grant
Decided14 December 2017
Application typePERMISSION
Source documents11

Site

What is on file

0refusal reasons9conditions8nearby records

Proposed development

Application description published by Clare County Council.
To convert an existing shed to a dwelling house and to construct a new front porch and rear extension, install a new proprietary treatment system along with associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with drawings received 28/08/2017 and further information received 30/11/2017.Compliance
  • 2Dwelling must be first occupied as permanent residence by the applicant and remain so for a minimum of 7 years. Permanent occupation only.Occupancy
  • 3Pay a development contribution of €5,549 to Clare County Council prior to commencement of development.Development Contribution
  • 4Finished floor level must match the site layout plan received 30/11/2017 and cannot be modified without prior written consent.Compliance
  • 5Roof must be natural quarry slate, slate effect, or flat tile in black/dark grey/blue-black. No neo-Georgian plastic glazing bars, changes to external wall finishes, or floodlighting permitted. Stone facing must be natural local stone with recessed/flush pointing.Design Materials
  • 6All surface water must be collected and disposed of within the site curtilage. No discharge into wastewater system, public road, or adjoining properties.Wastewater Drainage
  • 7All public service cables (electrical and telecommunications) must be located underground throughout the site.Compliance
  • 8Entrance must match site layout plan. Existing road boundary retained except where height reduction is needed for 160m sight distances or entrance construction.Traffic Access
  • 9Wastewater treatment system and polishing filter installed per submitted details and EPA Code of Practice (2009). Manufacturer certification within 4 weeks of installation. 3-year maintenance contract required. Soakaways diverted from WWT system. Stock proof fence erected around polishing filter.Wastewater Drainage

Planning a project near Fintra More, Cloonbony, Miltown Malbay?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 29 pages of searchable text on file.

11 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 8 documents.

Source documents

Original council portal records and source PDFs where available.

11 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →