17774: To construct a dwelling house, with waste water treatment unit and associated site works
Tullaher, Kilrush, Co. Clare
DecisionRefused
Decided04 December 2017
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 594af408-868a-4daa-b3b8-80b90c12b4cd.PDF / Document 400242Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 8ccef237-2f2c-445b-b8f8-3b76c7780d27.PDF / Document 400243Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 5a092cfd-e5b1-4d88-ae8c-b6f1be116d5f.PDF / Document 400244Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 223To Extend the Appropriate Period of Time for P16/867 to construct an extension to the side of the existing dwelling house and for planning permission to upgrade the existing sewage treatment system with all ancillary works / 2.3 km away / 02 March 2022Refused
- 25163To construct dwelling house, entrance, waste water treatment system and percolation area plus all ancillary site works / 2.6 km away / 16 October 2025Refused
- 2560257For a renewable energy development in the townlands of Moanmore Lower, Moanmore South, Tullabrack, Tullabrack East and Gower South, Kilrush, Co Clare. The Development will include the: • erection of 3 no. wind turbines with an overall ground to blade tip height of 150m, with a rotor diameter of 136m and a hub height of 82m and a total generating capacity of 15MW, • construction of turbine hard stand areas and turbine foundations, • construction of new internal site access tracks and upgrade of existing site track, to include all associated site drainage, • construction of 1. no new site entrance along the turbine delivery route with access onto the adjoining local road network (L6132), • construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, • development of a site drainage network, • construction of 1 no. 38kV electrical substation with all associated electrical plant and equipment, security fencing, lightening protection, security cameras and gates, and all ancillary structures and works, • 1 no. permanent spoil storage area, • all wind farm internal cabling connecting the wind turbines to the electrical substation, • all works associated with the permanent connection of the wind farm to the national electricity grid comprising a 38kV underground cable in permanent cable ducts from the proposed, permanent, on-site substation and to the existing Tullabrack 110kV ESBN Substation, • 2 no. flood compensation areas, • vertical realignment of an existing crest curve on the L6132 local road in order to prevent grounding of abnormal load vehicles during delivery of turbine components, • ancillary forestry felling to facilitate construction and operation of the development, • construction of a blade transfer area off the L6132, • provision of 2 no. biodiversity enhancement areas, • upgrade of an existing site entrance onto the adjoining local road network (L2034) including the demolition of an existing wall and removal of hedgerow at the site entrance to facilitate abnormal load vehicles during delivery of turbine components and reconstruction of same wall and replanting of hedgerow, • Landscaping and all associated ancillary works. This application is seeking a ten year permission and a 40 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS). / 4.1 km away / 02 July 2025Refused
- 22946To construct a new dwelling house, private garage, site entrance and on-site wastewater treatment system along with all other associated site works and services / 5.3 km away / 08 December 2022Refused
- 21807For a Proposed Serviced Caravan/ Motorhome Park consisting of set down bays for 37 static Mobile Homes, 19 Motorhomes, Open Space Area, Facilities Building, Bin store/ Recycling Compound, relocate the existing entrance addition 51 no. on-site car parking spaces Bed and Breakfast Building and all associated ancillary site works / 5.4 km away / 23 September 2021Refused
- 23496To develop a glamping facility with the provision of onsite parking, decommissioning of existing septic tank, connection to public sewer and the change of use of the existing cafeteria to administration greeting and meeting facility confined to patrons of the proposed glamping site to include all necessary ancillary services / 5.7 km away / 09 November 2023Refused
- 19803To construct a single storey dwelling, site entrance, site boundary, waste water treatment system and al associated site works / 5.7 km away / 28 November 2019Refused
- 2460268To construct a new dwelling house, private shed, site entrance, wastewater treatment system and all associated site works and services / 5.9 km away / 17 July 2024Refused