17803: For the extension to the rear of the existing house
Doolin, Co. Clare
DecisionConditional grant
Decided08 December 2017
Application typeRETENTION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 6517e7b5-110b-4d99-8cb5-72515eca95da.PDF / Document 400441Source PDF
- Final Grant / file 1 of 2Source: clarecoco.eplanning.ie / Ff2abd9d-2994-4ba7-862a-ca196cb421fa.PDF / Document 402846Source PDF
- Final Grant / file 2 of 2Source: clarecoco.eplanning.ie / C0b6126f-ee47-4919-84b5-d60926fba2a1.PDF / Document 402846Source PDF
- Planners Report / file 1 of 2Source: clarecoco.eplanning.ie / F2c7bb55-e5a5-423c-87a1-dd0a08246ceb.PDF / Document 400442Source PDF
- Planners Report / file 2 of 2Source: clarecoco.eplanning.ie / 30b87276-ea51-4bef-97d9-8bfca8f67dce.PDF / Document 400442Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 19836To RETAIN the following items which differ to that previously granted by P16/541: 1. Revised location and finished floor level of main building 2. Revisions to elevations of the main building 3. Revised locations of Waste Water Treatment System, Percolation area and car parking area 4. Retention of storage shed and wall surrounding Car park area to North West of Building and all ancillary site works associated with the development on site / 0.1 km away / 26 June 2020Conditional grant
- 20755The development will consist of a dwelling house and garage, proprietary wastewater treatment system, sand polishing filter and percolation area together with ancillary works / 0.1 km away / 28 January 2021Conditional grant
- 20878To build an extension onto the existing hostel and all associated site and ancillary works / 0.1 km away / 26 January 2021Conditional grant
- 20414To build two detached log cabins for the purpose of providing holistic therapies within the curtilage of Aille River Hostel and all associated site and ancillary works / 0.1 km away / 14 August 2020Conditional grant
- 17661For development which will consist of a) alterations to the development granted under parent planning ref: P13-298 to include 1. Change of use from Museum / Visitor Centre to Art Gallery / Craft Demo Area / Retail and 2. The removal of condition no. 18 from the parent planning permission. b) Extension to existing building consisting of a display window and c) Changes to fenestration of existing building to include a new door and window to the rear together with ancillary site works / 0.2 km away / 19 October 2017Conditional grant
- 20729The development will consist of a) the alteration of site boundaries as granted under planning ref. P13/298 and b) the installation of a proprietary wastewater treatment system, reed bed and polishing filter together with ancillary site works / 0.2 km away / 01 December 2020Conditional grant
- 25244To build a new house, install a waste water treatment system and all associated and ancillary site works / 0.2 km away / 03 November 2025Conditional grant
- 19813For the following works to Hotel Doolin. The works involve a) New Store area to the NE/SE Elevation b) to construct a single storey extension to the hotel in the internal courtyard area c) to construct an extension to the ground floor bar area on the SW Elevation along with associated site works / 0.3 km away / 06 December 2019Conditional grant