GrantedDecided 09 January 2018Clare County Council

Kyle, Broadford, Co Clare

Planning application 17852
DecisionConditional grant
Decided09 January 2018
Application typePERMISSION
Source documents9

Site

What is on file

0refusal reasons12conditions8nearby records

Proposed development

Application description published by Clare County Council.
For the construction of 1.5 storey detached dwelling, detached domestic garage, new entrance, proprietary waste water treatment system, connection to necessary services, boundary treatments and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with drawings received 07/11/2017 and amended 08/01/2018.Compliance
  • 2Dwelling must be first occupied as permanent residence by applicant and used for permanent occupation only.Occupancy
  • 3Finished floor level per Site Layout Plan (07/11/2017); no modification without Planning Authority consent.Design Materials
  • 4Access per plans (08/01/2018) with single entry. Existing front fence removed, replaced by wall/earthen mound with hedgerow (max 1.2m high, 2.4m from road). Area between boundary and road to be excavated, filled, drained, sealed, and left for parking.Traffic Access
  • 5External finishes to match plans received 07/11/2017.Design Materials
  • 6All public service cables (electrical, telecoms) to be underground.Other
  • 7Pre-development condition: Confirm adequate well water supply via yield, chemical, and bacteriological tests before construction starts.Water Services
  • 8All surface water collected/disposed within site curtilage. No discharge into wastewater system, public road, or adjoining properties.Wastewater Drainage
  • 9Wastewater system installed/maintained per approved details and EPA Code of Practice (2009). Manufacturer certification within 4 weeks. Min 3-year maintenance contract. Soakaways diverted from wastewater system.Wastewater Drainage
  • 10Side boundaries planted with native broadleaf trees (12-14cm girth). Informal clusters throughout site. Landscaping in first planting season; replace failed planting within 2 years.Landscaping Boundary
  • 11Garage not for human habitation or commercial activity.Other
  • 12Development contribution of €5,549 paid prior to commencement.Development Contribution

Planning a project near Kyle, Broadford, Co Clare?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Inside the decision file

Extracts from the council's own decision documents for this application — 24 pages of searchable text on file.
Chief Executives Order2 pages indexed
CLARE COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) Order No: $l SIG File Reference Number: P17/852 Name of Applicant: Kellie Carroll Address: c/o Tom Hannon OBB Consulting Engineers O'Briens Bridge, Co Clare Application Received: 07/11/2017 Additional Information Received: 08/01/2018 Nature of...
Chief Executives Order1 page indexed
9. (a)The proposed wastewater treatment system and percolation area/polishing filter shall be located, 10. 11. 12. installed and maintained in accordance with the details received by the Planning Authority on the 7" November 2017 and the Code of Practice Wastewater Treatment and Disposal Systems Serving Single Houses...
Chief Executives Order2 pages indexed
CLARE COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) Order No: tl SIG File Reference Number: P17/852 Name of Applicant: Kellie Carroll Address: cio Tom Hannon OBB Consulting Engineers O'Briens Bridge, Co Clare Application Received: 07/11/2017 Additional Information Received: 08/01/2018 Nature of...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 8 documents.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →