19563: To Extend the Appropriate Period to construct a dwelling house, separate garage, sewerage treatment system with percolation area and including all ancillary works
Cloonmore, Doora, Co Clare
DecisionUnconditional grant
Decided21 August 2019
Application typeEXTENSION OF DURATION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 66d4af4f-102e-404b-aa62-b34d77999416.PDF / Document 457687Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / E4ec1b47-1996-4c28-9e37-91b9bdde593b.PDF / Document 457689Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 9de62761-8c3c-42b6-a4e8-02414d95adb9.PDF / Document 457691Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 228000Proposes to carry out the following development. The development consists of a flood defence protecting three properties in Quin Co Clare. The defence consists of two sections of earthen embankment and a reinforced concrete wall. The reinforced concrete wall section is approximately 120m long, with a maximum height of 2.2m. To the south a 2m high embankment extends approximately 80m to higher ground. To the north a less than 1m high embankment extends approximately 20m to highter ground. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project and has determinined that a full Appropriate Assessment is not required in respect of the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of signigicant effects on the environment arising from the proposed development. / 2.6 km away / 09 May 2022Unconditional grant
- 25291To Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application / 3.3 km away / 03 November 2025Unconditional grant
- 228007To carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located approximately 300m south of the Dromoland East Roundabout. 2) An extension of the existing 60Kph speed limit for consideration of the scheme. 3) Installation of public lighting 4) The installation of associated signage. 5) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The masonry bridge is a Protected Structure RPS No.:211 NIAH 20404204 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4 / 3.4 km away / 12 September 2022Unconditional grant
- 17329To Extend the Appropriate Period of Planning Permission P11-448 for the construction of a new three-storey building and other development works / 4.2 km away / 26 June 2017Unconditional grant
- 18892To extend the appropriate period of Planning Permission P14/54 for the construction of two semi-detached houses / 4.6 km away / 07 January 2019Unconditional grant
- 21949To Extend the Appropriate Period of Planning Permission of P16-353 to demolish existing shed and to construct new detached Naionra (Montessori school) building with all associated site works / 5.1 km away / 01 November 2021Unconditional grant
- 20931To Extend the Appropriate Period of Planning Permission P15-517 to construct a proposed extension to connect garage to existing dwelling enveloping existing conservatory plus all ancillary site works / 5.1 km away / 22 January 2021Unconditional grant
- 21667To Extend the Appropriate Period of Planning Permission for P16/320 to construct extension to and change layout of existing dwelling house with all associated site works / 5.3 km away / 19 August 2021Unconditional grant