211057: For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore Wind Farm (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights between 14-19 metres), and approximately 1km of underground cabling. The cable will travel underground within the wind farm site (in the townlands of Cross More and Derrynageeha), underground on private lands (in the townlands of Boolynamweel, Illaunatoo and Boolynaknockaun) and under the public road prior to entering the Booltiagh substation (in the townlands of Boolynaknockaun and Booltiagh). 2. Roads and access arrangements/works consisting of: a) Creation of new permanent access gate into private lands off the L6180 local road; b) Construction of new access roads to facilitate provision of the grid connection, to be retained for permanent use; and c) Upgrade of the existing public road network for turbine delivery including; I. Junction improvement works at the N68 and L6180; II. Widening along the L6180. 3. The proposed development also incorporates construction of the following elements at the site of the permitted 7-turbine Crossmore Wind Farm (ref: P09/123, as extended by P19/388, and altered by P20/824) which will have a 25 year operational lifespan from the date of commissioning: a) Provision of a permanent 38kV substation north of permitted Turbine 5 in lieu of previously approved substation located south of Turbine 2; b) Redesign of permitted turbine hardstand areas consisting of additional temporary hardstand areas for blade storage; c) Provision of 2 no. temporary construction compounds; d) Proposed upgrade of existing access road and proposed new areas of access road between permitted Turbines no. 5 and no. 6, in lieu of permitted upgrade of existing access road between permitted Turbines no. 2 and no. 5; e) All associated underground cabling between permitted turbines and relocated substation, and; To view remainder of description please view newspaper notice.
Crossmore Derrynageeha Ballyduneen Carrowreagh West Corraige Knocklough, Crag Furroor Boolynamweel Illaunatoo or Sorrelisland, Boolynaknockaun Glenmore Booltiagh
DecisionConditional grant
Decided07 April 2022
Application typePERMISSION
Source documents9
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 90c6504d-8dbd-466d-a945-c3901a2351e4.PDF / Document 576970Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / Ccc0a2e4-af16-44e9-ad1f-0207ad28af7e.pdf / Document 599084Source PDF
- Final Grant / file 1 of 2Source: clarecoco.eplanning.ie / 0038e7f7-a575-4845-abd5-5e9b36653676.pdf / Document 604973Source PDF
- Final Grant / file 2 of 2Source: clarecoco.eplanning.ie / E7fbb828-10b7-4947-9a38-3296d97a26b8.pdf / Document 604973Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 9d14d40c-34f6-44ab-bac3-ebdfe662f21d.PDF / Document 576973Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 2f283dad-41cf-434a-96ee-e6ad7ac975da.PDF / Document 576975Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / A3d7e636-8dfe-47b4-9504-6d713f18b0a4.pdf / Document 599086Source PDF
- F I Request LetterSource: clarecoco.eplanning.ie / 75a32041-22ed-449d-bb78-c6b196bb414c.PDF / Document 576968Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22720To demolish existing shed and barn, construct a new dwelling house and garage, construct a new entrance and modify existing farm entrance, install a new sewerage treatment system along with all associated works / 0.1 km away / 27 March 2023Conditional grant
- 23223To carry out alterations and extension to the existing dwelling and add a storage shed along with all associated works / 0.3 km away / 21 August 2023Conditional grant
- 211120For (A) the construction of a porch to the rear of the dwelling and (B) the construction of a detached building, incorporating a private garage, open shed, and green house and for PERMISSION to construct an extension to the side of the dwelling, all with associated site works / 0.5 km away / 14 December 2021Conditional grant
- 18928To construct a new dwelling house, private garage, entrance and sewerage treatment facilities along with all associated works / 0.6 km away / 08 January 2019Conditional grant
- 18656To construct a private garage to the rear of dwellinghouse / 0.7 km away / 04 October 2018Conditional grant
- 20557To RETAIN an extension comprising a kitchen, dining room, 1st floor bedroom and a porch. PERMISSION for construction of a two bedroom ancillary residential flat strictly for family use and associated groundwork including change of use of 1st floor bedroom to attic storage / 0.8 km away / 30 March 2021Conditional grant
- 21411To renovate and extend an existing cottage, construct a private garage, new entrance and driveway and install a new wastewater treatment system along with all associated works / 1.0 km away / 10 August 2021Conditional grant
- 211113To (a) demolish an existing garage and (b) permission to construct extensions to the front and side of an existing dwelling house along with alterations to the existing dwelling including lifting the roof to incorporate first floor living accommodation and (c) permission to construct a new garage, along with ancillary works / 1.3 km away / 13 December 2021Conditional grant