21802: To construct an extension to the side of the existing dwelling house along with all associated site works and ancillary services
8 Bogbere Avenue, Ennistymon, Co Clare
DecisionConditional grant
Decided21 September 2021
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / F198dcbd-09b5-4a16-baa2-43ecdced2148.PDF / Document 566063Source PDF
- Final GrantSource: clarecoco.eplanning.ie / Bca6d82c-bc4e-4acd-aaa6-2516323e2570.PDF / Document 572172Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 0f2f70f6-0da3-4565-8ae7-440692082f0f.PDF / Document 566065Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / Ebeb5fc6-153c-4f26-bf87-b6f12559e982.PDF / Document 566066Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460508To construct a first floor extension on top of the existing single storey extension to the side of the house and RETENTION permission for elevational changes to the dwelling house and the construction of a garden shed along with all associated siteworks / 0.0 km away / 27 November 2024Conditional grant
- 22293For the following works a) to construct a two-storey side extension and single-storey rear extension to existing house b) a new boiler house c) single storey office/store d) new front boundary wall along with associated site works / 0.1 km away / 16 September 2022Conditional grant
- 22933For development which will consist of the demolition of existing single storey garage, construction of new storey and a half one bedroom studio accommodation, new boundary fencing and gates, on site parking, connection to public mains water and sewage and all associated site works / 0.1 km away / 13 June 2023Conditional grant
- 221120For development at this site of Armsteads building (a protected structure) Bogbere Street, Ennistymon, Co Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and asociated landscaping and ancillary site works, for use as private dwelling with home office / 0.1 km away / 09 February 2023Conditional grant
- 188000For the development of an Inner Relief Road in Ennistymon, including a new vehicular bridge crossing of the Inagh/Cullenagh River approximately 80 metres upstream of the existing Bridge crossing. The overall route runs from a point located approximately 170 metres south east of Blake's Corner on the N85 National Road to a point located approximately 180 metres west of Blakes Corner on the N67 National Road, via Bogbere Street. The development includes the pedestrianisation of the existing bridge, the inclusion of a roundabout at the Western end of the proposed new bridge crossing on the L-1084 and the relocation of the existing public car park adjacent to New Road ( N85 ),. The development also includes the demolition of three existing properties ( two retail/residential units and one residential unit ) in the Ennistymon Architectural Conservation Area and would materially affect the character of the area concerned. In accordance with the Habitats Directive, an Appropriate Assessment Screening has been carried out on the project. An Environmental Report also accompanies this application. / 0.1 km away / 29 March 2018Conditional grant
- 22152For development at this site of Armsteads building (a protected structure), Bogbere Street, Ennistymon, Co. Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and associated landscaping and ancillary site works, for use as private dwelling with home office and three B&B guest rooms / 0.1 km away / 22 September 2022Conditional grant
- 2560378For the refurbishment and extension to an existing terrace house and all associated site works / 0.1 km away / 07 November 2025Conditional grant
- 17484For development which will consist of the temporary change of use for a period of three years of part of the existing Family Resource Centre Building at An Grianán, Bogbere St, Ennistymon, Co. Clare, area 102 m2 from Community Support Facility to Preschool, and replace existing rear external door with connections to existing services / 0.1 km away / 14 August 2017Conditional grant