21813: For renovation and extension of existing private dwelling house and all associated site works
Ballyshanny, Kilfenora, Co Clare
DecisionConditional grant
Decided22 September 2021
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Clare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 660e998e-ec46-4fca-85e0-42c7f4ed6e67.PDF / Document 566116Source PDF
- Final GrantSource: clarecoco.eplanning.ie / 0bed736e-5bef-4dfd-9b51-00cf5ce17758.PDF / Document 572053Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 732fff9d-60fe-4903-8d00-684873241c86.PDF / Document 566117Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 0fa27c5e-17d5-4046-9f45-2b3540d239f0.PDF / Document 566118Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460204To renovate and extend the existing dwelling house including the replacement of the existing extension, upgrade of wastewater treatment system, upgrade of existing entrance and all associated site works. / 0.4 km away / 26 June 2024Conditional grant
- 2660068For the demolition of an existing two-storey end-of-terrace dwelling affected by defective concrete blocks and the reconstruction of a replacement dwelling, with minor alterations and extension, together with all associated site and ancillary works / 0.5 km away / 02 April 2026Conditional grant
- 23417To renovate and extend the existing cottage & all other site and ancillary works / 0.7 km away / 16 February 2024Conditional grant
- 25194To revise the plans previously granted under planning reference P23/417 / 0.7 km away / 06 August 2025Conditional grant
- 25204Of the revised boundaries, which differ those previously granted under Ref 01/263 / 0.7 km away / 08 August 2025Conditional grant
- 23550To renovate an existing vacant building and to construct an extension to the rear. Construct new divisional boundary wall to the East, demolish existing outbuildings, provide new gated entrance in existing front wall and build up existing, and carry out all ancillary site works / 0.8 km away / 15 December 2023Conditional grant
- 2460061To apply a mural to the South elevation of the community Hall / 0.8 km away / 11 April 2024Conditional grant
- 2560013The proposed development will consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanála under reference ABP-305756-19, and consists of: 1. Modifications to site access and internal roads at the wastewater treatment plant to include (a) raising of access road level from the public road (L1034) to the site entrance gates, to include provision of permeable paving finish, and (b) widening/reconfiguration of internal road in focused areas, permeable paving finish, hard surface area and gully, and provision of petrol interceptor; 2. Modifications to site access and internal road at the percolation area to include new roadside channel drain and provision of permeable paving finish; 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application / 0.8 km away / 12 March 2025Conditional grant