24223: To renovate and extend the existing derelict dwelling, build a garage, install a wastewater treatment system and all other associated site and ancillary works
Knockneppy, Lahinch, Co. Clare
DecisionRefused
Decided03 September 2024
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: clarecoco.eplanning.ie / 3bf844e1-78ef-4039-a5b8-3324f0aa2ca1.pdf / Document 755606Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / B7e7242f-4a4d-44bb-9180-58e49540717f.pdf / Document 755608Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / C56919bd-55f8-4ae9-bfd9-d8c9f2e197eb.pdf / Document 755615Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 168b14d2-9bfc-4f41-8625-17c71bd4f483.pdf / Document 755616Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 8bac2397-4cff-4a42-813b-d8af76374a30.pdf / Document 755618Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 211313To construct a farm machinery shed, with all associated site works / 3.8 km away / 08 February 2022Refused
- 201013For development at this site of a private dwelling house, polytunnel dome, refurbishment of the existing access lane with widened entrance and all necessaries utilities and services connections. The existing dwelling shall be retained and incorporated in the new dwelling house / 6.0 km away / 23 April 2021Refused
- 211226For a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning; 3. A Meteorological Mast with a height of 30 metres; 4. All associated underground electrical cabling (33kV) connecting the proposed turbines via Ring Main Unit (RMU) to the 110kV substation in the townland of Knockalassa; 5. Permanent extension to the 110kV substation at Knockalassa comprising extension to the existing substation compound, provision of a new control building with welfare facilities and all associated electrical plant and equipment for an additional 110kV bay and security fencing; 6. Upgrade of access junctions; 7. Upgrade of existing tracks/roads and provision of new site access roads and hardstand areas; 8. 2 no. borrow pits; 9. 2 no. temporary construction compounds; 10. Site Drainage; 11. Forestry Felling; 12. Operational stage site signage; and 13. All associated site development ancillary works and apparatus. The Proposed Development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten-year planning permission. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application / 6.3 km away / 20 January 2022Refused
- 21370For a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed turbines to an existing 110kV substation in the townland of Knockalassa; v. Permanent extension to the 110kV substation at Knockalassa comprising of a new control building with welfare facilities, associated electrical plant and equipment and security fencing; vi. Upgrade of access junctions; vii. Upgrade of existing tracks/ roads and provision of new site access roads and hardstand areas; viii. 2 no. borrow pits; ix. 2 no. temporary construction compounds; x. Site drainage; xi. Forestry felling; xii. Operational stage site signage; and xiii. All associated site development works and apparatus. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development / 6.3 km away / 03 June 2021Refused
- 2635To Extend the Appropriate Period of Planning Permission P21/87 to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works / 6.5 km away / 02 April 2026Refused
- 21716To A) demolish and existing substandard cottage, B) Construct new dwelling house and garage, C) Widen and realign access roadway, D) Install wastewater treatment system with soil polishing filter, E) Install bored well together with all associated site development works and services / 6.6 km away / 21 December 2021Refused
- 22433To (a) Renovate and extend existing substandard cottage, (b) construct new entrance with public road (c) widen and realign access roadway (d) install wastewater treatment system with soil polishing filter (e) Install bored well together with all associated site development works and services / 6.6 km away / 15 August 2022Refused
- 2239To Extend the Appropriate Period of Planning Permission P19-450 to alter and reduce approved redevelopment design of existing filling station permitted under P16-251 and P18-73 and P19-450 together with all associated site development works and services / 6.6 km away / 15 March 2022Refused