2560014: For the development which will consist of a 2 storey Community Care Centre, new vehicular entrance, ESB substation, roof mounted PV panels, associated signage (and potentially illuminated signage) and all associated siteworks
Bealach Brí, Tullyvarraga, Shannon Co. Clare
DecisionConditional grant
Decided14 August 2025
Application typePERMISSION
Source documents10
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: clarecoco.eplanning.ie / 7b7f2520-96a3-44a2-aaad-aa13f5699a10.pdf / Document 829599Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / Fda73fae-66e8-4d04-84e7-ebb14ef662a6.pdf / Document 793823Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / 4a9a58d0-09e9-4593-8810-98be5f15eb0a.pdf / Document 822089Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / A1f297f5-caac-4e58-9e10-865f5a576780.pdf / Document 829598Source PDF
- Final GrantSource: clarecoco.eplanning.ie / 5c78578a-745d-46c6-a05f-ed148cbc6392.pdf / Document 839660Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 32a986d3-f03d-4e6b-83e6-17aec161ff4c.pdf / Document 793821Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / D99315c4-cb06-4180-b27f-ac3a111ece62.pdf / Document 822088Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / D59d802c-a16d-45d5-8389-c7453e774412.pdf / Document 829596Source PDF
- F I Request LetterSource: clarecoco.eplanning.ie / 10d8b559-2214-44d0-a1e0-cb03df5a9d6f.pdf / Document 793824Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 178003For the following proposed development: The redevelopment of Shannon Town Park along with Rineanna Park to deliver a new flagship Shannon Town Park. The proposed works include the creation of a natural water feature, adventure play area and a bandstand/performance area, along with the formal laying of footpaths, cycling track, lighting and the creation of formal and informal seating areas including all ancillary site works and services. The development will also include a pedestrian crossing on Bóthar Linne and works to the two no. junctions on Bóthar Linne along the southern perimeter of the site / 0.1 km away / 10 April 2017Conditional grant
- 21469The development will consist of the change of use of existing convenience shop to include part off-licence use (gross floor area for off-licence use 22 sq.m) and associated works / 0.2 km away / 07 July 2021Conditional grant
- 2460629For a motor vehicle valet centre to include tunnel and jet car wash, valet bays, customer waiting facilities, alteration to existing entrance, signage and all associated site development works / 0.2 km away / 17 April 2025Conditional grant
- 17296To remove existing Pre-School Portacabin and for permission for the Installation of a Modular Building Pre-School Facility with integrated Toilet facilities as a replacement, existing connections to public services on site to be utilised and including ancillary site works / 0.2 km away / 07 June 2017Conditional grant
- 18486For change of use and subdivision of unit from office/commercial use to separate restaurant/café and restaurant and take away, and associated site works at Former E.S.B. Premises, Shannon Town Centre, Shannon, Co. Clare / 0.3 km away / 26 April 2019Conditional grant
- 211223To alter the previously approved planning permission for two restaurant units (ref no. P18/486) by subdividing / reducing the area of the area of the originally approved restaurant (unit 1) and constructing a small extension to the rear to provide an additional take away unit. Together with associated elevational changes and site works at the former ESB Premises / 0.3 km away / 19 January 2022Conditional grant
- 21576The development will consist of; (i) Construction of a new single storey Primary School (1,318m2), new internal road with set-down area and car parking, covered bicycle parking and entrance gate, new site boundaries, hard play area, landscaping and all associated site works on a site area of 1.94 acres, (ii) new site entrance from Bealach Bri, (iii) new bus set down, adjacent to new entrance, on Bealach Bri and associated road works at the junction of the proposed site entrance, (iv) Removal of 5no existing temporary prefabricated classrooms granted planning under 16/301 and RETENTION of pre-school modular cabin granted planning under 17/296 / 0.3 km away / 03 March 2022Conditional grant
- 2560628For development which will consist of the demolition of the flat roofed annex and the addition of extensions to south-east and north-east, a new external porch to front of dwelling, and demolition of the two gate pillars to either side of driveway entrance, along with associated site works above and below ground / 0.3 km away / 05 December 2025Conditional grant