Caherfeenick, Cree, Co. Clare
Planning application 2560256
DecisionConditional grant
Decided27 June 2025
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Clare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Caherfeenick, Cree, Co. Clare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 27 pages of searchable text on file.Chief Executives Order2 pages indexed
CLARE COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) Order No: $S5%64 File Reference Number: P25/60256 Name of Applicant: Don English Address: c/o Atlantic Building Consultants Unit 1, Digital‘:Hub Merchants Quay Business Quarter Frances Street Kilrush Co. Clare V15 FN53 Application Received: 08/05/2025...
Final Grant4 pages indexed
A or ee | Don English, COMHAIRLE | CLARE c/o Atlantic Building Consultaatstac AN CHLAIR | COUNTY COUNCIL Unit 1, Digital Hub, Merchants Quay Business Quarter, Frances Street, Kilrush Co. Clare. 5" August 2025 Re: Planning Ref No. P25/60256 A Chara, , ) | attach herewith a Grant of Permission & Retention Permission...
Notification Of Decision5 pages indexed
CLARE COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) oN Sp NOTIFICATION OF DECISION TO GRANT PERMISSION AND RETENTION coe | PERMISSION (SUBJECT TO CONDITIONS) UNDER SECTION 34 OF THE PLANNING Comhairle Contae an Chlair AND DEVELOPMENT ACT 2000 (AS AMENDED) Clare County Council To: Don English c/o...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: clarecoco.eplanning.ie / 4922e23b-fc9c-4965-84a0-fb6f7224cee1.pdf / Document 818659Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / F8161195-98ac-477d-bc29-ec4c3c0e6525.pdf / Document 818657Source PDF
- Final GrantSource: clarecoco.eplanning.ie / 43c759bc-77d6-4e83-98c6-a107a57f3254.pdf / Document 827934Source PDF
- Planners Report / file 1 of 2Source: clarecoco.eplanning.ie / D9861590-949f-4516-851e-9d68a7c669ac.pdf / Document 818655Source PDF
- Planners Report / file 2 of 2Source: clarecoco.eplanning.ie / 84a9d2f4-b7c0-4fdd-ae68-ce48315de5e8.pdf / Document 818655Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 25343Of domestic gable extension / first floor increase, elevational/fenestration changes including raised ridge/soffit heights etc to existing dwelling and B & B, previously granted under Planning Ref P99-2304, plus all ancillary site works / 0.3 km away / 15 December 2025Granted
- 20372To extend dwelling house, to revise existing house elevations and for new site entrance. / 0.4 km away / 22 September 2020Granted
- 178005For the following development: The existing three-span bridge will be demolished. A new two-span bridge of reinforced concrete with masonry finish will be constructed including a local realignment of the N-67 at the bridge. Ancillary site development works will be necessary to facilitate the demolition and construction works / 0.5 km away / 11 December 2017Granted
- 2460176For renovation works and two storey extension to existing dwelling, demolition of existing sheds, new wastewater treatment system and polishing filter, all associated site works and services / 0.5 km away / 12 June 2024Granted
- 2460190Of existing apartment, sun room and shed / 0.6 km away / 25 July 2024Granted
- 2360036To construct a new dwelling house, private garage, site entrance with connection to public sewer and all other associated site works / 0.7 km away / 18 April 2023Granted
- 18930For development including the construction of Ballroom/Function Room building; Leisure Facility building including restaurant; 53 no dwellings to be used for short term tourist accommodation; minor alterations to Doughmore house; a gatehouse; additional car parking and cycle parking. The development will also provide for the dismantling and removal of the existing Marquee structure, all associated ground works, ancillary works and enabling works and connection to existing services and facilities. The proposal will be developed on undeveloped lands previously part of planning permission P03/937 and associated permissions which have been part implemented, which provided for the construction of the existing Trump International Golf Links and Hotel and associated facilities. The development will be on a site of approx. 9.76 Ha (Circa 10Ha). This application is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR) / 0.7 km away / 09 October 2019Granted
- 2560838For development of this site at Trump International Golf Links & Hotel, Doonbeg, Kilrush, Co. Clare, V15 KH39. The development will consist of: a) The demolition of the existing event marquee and its associated service areas; the demolition of Doughmore House, including its associated shed, concrete yard, boiler and plant room to the rear. All associated hardstanding, access roads, foundations, services, utilities and site infrastructure relating to the above elements will be removed. b) The construction of a new single-storey ballroom building, comprising a main function room; lobby and pre-function areas; reception space; bar and lounge areas; champagne and tea stations; bridal suite; guest WCs; staff facilities; kitchen and catering areas; chair and bar stores; internal service and plant spaces; an external service yard; and a partially covered external terrace. c) The reconfiguration, upgrading and extension of existing car parking and internal circulation areas, including revised vehicular and pedestrian routes, set-down areas, bicycle parking provision, resurfacing, lighting, and all associated hard and soft landscaping works. d) Site development and landscape works, including embankments, regrading and contouring, footpaths, paved areas, planting, boundary treatments, surface water and foul drainage works, services and utilities connections, and all works required to integrate the development into the existing hotel campus. e) All ancillary site development, excavation and infrastructural works necessary to facilitate the proposed development. A Natura Impact Statement (NIS) has been prepared for this development and is submitted with this planning application / 0.8 km away / 23 February 2026Granted