2680: To construct Bull Housing Shed with attached Manure Pit to existing farmyard, plus all ancillary site works
Kilrush Road, Doonbeg, Co. Clare
DecisionConditional grant
Decided18 May 2026
Application typePERMISSION
Source documents7
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: clarecoco.eplanning.ie / 9e7a2a4d-aced-4f8f-99c4-3439fc7b8f83.pdf / Document 889740Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / Eb798d1e-1853-4552-b43b-fba76e796361.pdf / Document 889741Source PDF
- Final Grant / file 1 of 2Source: clarecoco.eplanning.ie / 005533c1-03be-4e44-bf66-b55ec7b970e6.pdf / Document 897398Source PDF
- Final Grant / file 2 of 2Source: clarecoco.eplanning.ie / 37c8b5ea-ba57-42b1-a618-de1c7231619d.pdf / Document 897398Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 862cb20b-291b-447e-9344-d89f7cb7310f.pdf / Document 889742Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 71ef4f2c-a87a-4152-9007-0dcc1b4ea518.pdf / Document 889744Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 25171To construct silage slab and tipping apron to existing farmyard plus all ancillary site works / 0.0 km away / 10 September 2025Conditional grant
- 18950To RETAIN repositioned windows and doors, additional windows, and sun lounge to the side ( South Elevation), "as built" in relation to Planning Approval Ref: P01-424 / 0.7 km away / 23 January 2019Conditional grant
- 218002Proposes to carry out the following development. The construction of a new housing estate development consisting of: a) 8 no. residential units comprising of: 2 No. 3-bedroom, two-storey semi-detached dwellings; 3 No. 2-bedroom, two-storey semi-detached dwellings; 3 No. 2-bedroom single storey semi-detached dwellings; b) 13 ancillary car parking spaces within the development. c) The construction of vehicular and pedestrian access points to the site from Dun Na Mara housing estate. d) Alterations to ground levels to accommodate the development. e) Varied boundary treatments and landscaping works. f) Surface water management will include hydrocarbon interceptor. g) Footpath to N67 and link to village. h) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. / 0.8 km away / 14 June 2021Conditional grant
- 2560605Of a coffee trailer and seating area along with associated site works and services / 0.9 km away / 24 November 2025Conditional grant
- 2460540For the installation of an ATM machine to the front elevation of the existing shop premises / 0.9 km away / 06 December 2024Conditional grant
- 2360529For subdivisions of existing derelict townhouse into two townhouses, construct extensions to both townhouses, demolition of an existing roadside structure, construction of a first floor apartment & access to rear parking, development of parking spaces along with all associated site works / 0.9 km away / 27 March 2024Conditional grant
- 18315To build 2 No. semi-detached dwelling houses on sites No. 20 and 21, with all necessary ancillary services / 0.9 km away / 02 October 2018Conditional grant
- 21262To construct a side extension to the existing dwelling house along with all associated site works / 1.0 km away / 14 May 2021Conditional grant