CAPPABOY BEG, CAPPABOY BEG,
Planning application 00/6590
DecisionConditional grant
Decided12 October 2001
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near CAPPABOY BEG, CAPPABOY BEG,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/6910Modifications to a previously permitted 10 no. turbine windfarm to include increase in hub height from 47m to 65m, increase in blade tip height from 75m to 91m and the movement of a number of turbines to new locations / 0.0 km away / 27 October 2004Granted
- 25/6398Permission for a period of 10 years for development of this site. The proposed development will consist of the provision of the following: I. 3 no. wind turbines with an overall turbine tip height of 156.5 metres; a rotor blade diameter of 133 metres; and hub height of 90 metres, and associated foundations, hard-standing and assembly areas; II. Continued use of the existing onsite 38kV substation and associated 38kV underground cabling (built under Cork County Council Ref. No. 00/6590 / An Coimisiún Pleanála Ref. No. 04.127297); III. A meteorological mast with a height of 30 metres above ground and associated foundation and hard-standing area; IV. All associated underground electrical and communications cabling connecting the wind turbines and meteorological mast to the existing onsite 38kV substation; V. A temporary construction compound (including 2 no. site offices and staff facilities (with a combined floor area of 60 sq.m); VI. A borrow pit; VII. Peat and spoil management; VIII. Upgrade of existing site tracks / roads and provision of new site access roads, junctions and hardstand areas; IX. Temporary improvements and modifications to the existing site access junction off the R584 to facilitate delivery of turbine components; X. Upgrade of an existing access track off the R584, including temporary improvements and modifications to facilitate a turbine component turning area; XI. Tree Felling and Vegetation Removal; XII. Biodiversity Enhancement measures (Kerry Slug habitat enhancement, peatland habitat enhancement, and riparian planting of native broadleaf trees); XIII. Site Drainage; XIV. Operational stage site signage; and XV. All associated site development works, ancillary works and apparatus. A 35-year operational life from the date of the full commissioning of the wind turbines and subsequent decommissioning of the development is being sought. An Environmental Impact Assessment Report (EIAR) and Naura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. Cead a iarraidh ar feadh tréimhse 10 mbliana, chun an suíomh seo a fhorbairt sna bailte fearainn Doirín Dún Aodha, An Currach Glas, An Cheapach Bhuí Bheag, agus An Inse Mhór, Co. Chorcaí. Cuimseofar na nithe seo leanas san bhForbairt Bearthaithe; I. 3 thuirbín gaoithe le huasairde barr tuirbín de 156.5 méadar; trastomhas lann rótair de 133 méadar; agus airde moil de 90 méadar, agus na boinn, na limistéir chrua-sheasta agus na limistéir tionóil ghaolmhara; II. Úsáid leanúnach an fhostáisiúin 38kV atá ar an Suíomh cheana féin agus an cháblaíocht faoi thalamh 38kV gaolmhar (tógtha faoi Uimhir Thagartha Chomhairle Contae Chorcaí 00/6590 / Uimhir Thagartha an Choimisiúin Phleanála 04.127297); III. Crann meitéareolaíochta atá 30 méadar ar airde os cionn na talún agus an bunús agus an limistéar crua-sheasta gaolmhar; IV. An cháblaíocht leictreach agus cumarsáide faoi thalamh gaolmhar go léir a nascann na tuirbíní gaoithe agus an crann meitéareolaíochta leis an bhfostáisiún 38kV atá ann cheana féin ar an Suíomh; V. Compún tógála sealadach (lena n-áirítear 2 oifig suímh agus áiseanna foirne, (le hachar urláir comhcheangailte de 60 méadar cearnach); VI. Sloc iasachta; VII. Bainistiú móna agus cartadh; VIII. Uasghrádú ar rianta/bóithre suímh atá ann cheana féin, agus soláthar bóithre rochtana suímh nua, acomhail agus limistéir chrua-sheasta; IX. Feabhsuithe agus modhnuithe sealadacha ar an acomhal rochtana suímh atá ann cheana féin amach ón R584 chun seachadadh ualaí neamhghnácha a éascú; X. Uashghrádú ar an mbóthar rochtana atá ann cheana féin amach ón R584, lena n-áiritear feabhsuithe agus modhnuithe chun limistéar casadh comhpháirteanna tuirbíne a éascú; XI. Leagan Crann agus Baint Fásra; XII Bearta Feabhsúcháin Bithéagsúlachta (feabhsú gnáthóige drúchtín ballach, feabhsú gnáthóige portaigh, agus plandáil crainn dhúchasacha leathanduilleacha bruachánach); XIII. Draenáil Suímh; XIV. Comharthaíocht ar s / 0.8 km away / 22 December 2025Granted
- 00/6092Erection of 30m high wind monitoring system / 1.0 km away / 06 December 2000Granted
- 11/103Retention of construction of extension to rear of dwelling / 1.2 km away / 05 April 2011Granted
- 25/318Permission for Retention for the following works:- A) Dwelling house as previously granted under planning Ref. No. 05/8194. B) Construction of a domestic workshop. C) Construction of kid's playhouse. D) Construction of a domestic storage shed. E) Construction of a timber storage shed. F) Construction of a garden tool shed. G) Construction of a hen's shed. H) Erection of a polytunnel. I) For reconfiguration of existing entrance and site boundaries as previously granted under planning ref. 05/8194, and for all associated site works. J) Permission also sought for upgrade of existing septic tank system with new on-site wastewater treatment system / 1.3 km away / 16 July 2025Granted
- 05/8194Dwelling, treatment system including septic tank and reedbed / 1.3 km away / 10 January 2006Granted
- 99/1387Construction of two storey extension to dwellinghouse / 1.5 km away / 17 June 1999Granted
- 12/335Dwelling house and all associated site works / 2.0 km away / 12 July 2012Granted