Planning application 03/5539
DecisionConditional grant
Decided22 June 2004
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Glenaknockane Banteer Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 06/8416Dwellinghouse / 0.1 km away / 21 August 2006Granted
- 04/8606Construction of bungalow / 0.1 km away / 06 April 2006Granted
- 06/13644Construction of slatted cattle house with 3 no. underground slurry tanks and silage slab / 0.7 km away / 23 February 2007Granted
- 05/1856Dwellinghouse / 0.9 km away / 18 May 2005Granted
- 08/9136Retention of canopy to front and single storey extensions to rear and side of dwellinghouse, detached domestic shed and wastewater treatment system / 1.0 km away / 25 November 2008Granted
- 03/5748Bungalow and garage / 1.1 km away / 21 January 2004Granted
- 23/601710 Year Planning permission for a solar array with a total area of circa 16 hectares. The development will consist of solar panels on ground mounted frames, 2 no. single storey control cabins with associated electrical transformer unit and hardstand areas, 1 no. ring main unit, underground cabling within the solar array site to connect solar array field parcels, 33kV underground grid connection cabling to the existing Bweeng 38kV substation (within Esk windfarm), security fencing, CCTV, access tracks (upgrade of existing and new), upgrades to existing agricultural field entrance on the L5258, landscaping and all associated ancillary apparatus and development works. Operational access will be via the entrance from the L5258. The solar array will connect to the national grid and will have an operational lifespan of 40 years. Planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. / 1.2 km away / 20 May 2024Granted
- 22/4270Installation of a cattle underpass, soiled water tank and associated works. / 1.2 km away / 03 June 2022Granted