Knockroe Bandon Co. Cork
Planning application 03/5916
DecisionConditional grant
Decided09 March 2004
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Knockroe Bandon Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 25/4666Permission for extraction of sand & gravel over an area c3.5 ha; extraction by dry working to a level 2 metres above ground water level at a maximum rate of 100,000 tonnes per year; transport of the extracted sand & gravel to the adjacent Dromkeen pit (plan ref. 23/04780) for use in concrete production; upgrading of the existing internal access road and use of the existing access onto the local road L3204; provision of wheelwash and welfare unit (c8.3sqm) and restoration of the lands to agricultural and natural habitat use, all within an application area of c4.0 hectares. Permission is sought for 15 years plus two years for final restoration (total duration of seventeen years). The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR). / 0.5 km away / 06 February 2026Granted
- 03/4142 storey extensions to dwelling and single storey exercise pool extension to dwelling / 0.7 km away / 25 August 2003Granted
- 22/43411. Construct a new one and a half storey small dwelling house – granny flat. 2. Decommission the existing septic tank that serves the existing dwelling house on site. 3. Install a new waste water treatment system and percolation area which will serve the existing dwelling house and the proposed small dwelling house – granny flat. 4. Carry out all associated site works. / 0.8 km away / 03 October 2022Granted
- 25/4996Permission for the construction of a detached two-storey dwelling, creation of a new site entrance from an existing private lane, including the provision of a waste water treatment system and all associated site development works / 0.8 km away / 14 July 2025Granted
- 07/7285Dwellinghouse / 0.8 km away / 19 June 2007Granted
- 06/13074Two storey dwellinghouse / 0.8 km away / 11 April 2007Granted
- 16/4951Import up to 100,000 tonnes of dredging spoil from the Bandon River, generated by the Bandon Flood Relief Scheme over a 2 year works period, into Dromkeen Quarry, for use in the restoration of a worked out area in the south-east of the quarry site as an amendment to the restoration scheme already permitted under the terms and conditions of planning permission 08/8581 / PL04.232776. This application will be accompanied by an Environmental Impact Statement (EIS). / 0.9 km away / 31 August 2016Granted
- 11/4203Completion of dwellinghouse, garage and associated site works permitted under Planning Reg. No. 06/9394 / 0.9 km away / 04 April 2011Granted