Site no. 5, Church Road Farnahoe Innishannon
Planning application 03/6889
DecisionRefused
Decided22 April 2004
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site no. 5, Church Road Farnahoe Innishannon?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 18/6518The construction of 6 houses consisting of four no. 4-bed semi-detached houses and two no. 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Nos. 99/5878 and 14/4845), connection to the existing temporary wastewater treatment plant serving Ard Aoibhinn (permitted by Planning Reg. No. 07/10356), all associated site development works and services. The development will replace house no. 39 and public open space previously permitted under Planning Reg. No. 99/5878. / 0.2 km away / 16 November 2018Refused
- 08/78512no. dwellings / 0.2 km away / 08 September 2008Refused
- 21/6053The construction of 26 no. dwelling houses and all associated ancillary site development works including access, footpaths including a new footpath along the L-6067-0, parking, drainage, landscaping and amenity areas. The proposed dwelling units will replace 4 no. residential units previously permitted along the south east boundary of the site under Cork County Council Ref. 13/4528 (Extended under Ref. 18/7090). / 0.2 km away / 18 July 2022Refused
- 20/5236The construction of four no. 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Ref’s 99/5878 and 14/4845), connection to the existing temporary wastewater treatment plant serving Ard Aoibhinn (permitted by Planning Reg. Ref. 07/10356), all associated site development works and services. The development will replace house no. 39 and amend the public open space previously permitted under planning reg. ref 99/5878. / 0.2 km away / 12 August 2020Refused
- 19/5762Construction of 6 houses consisting of four no 4-bed semi-detached houses and 2 no 3-bed semi-detached houses, as part of the existing Ard Aoibhinn housing development which is currently under construction (permitted by Planning Reg. Ref’s 99/5878 and 14/4845), connection to the existing temporary waste water treatment plant serving Ard Aoibhinn (permitted by Planning Reg. ref 07/10356), all associated site development works and services. The development will replace house no. 39 and public open space previously permitted under planning reg. ref 99/5878. / 0.2 km away / 04 September 2019Refused
- 08/6295Split level dwellinghouse / 0.3 km away / 18 June 2008Refused
- 05/1953Construction of split level dwelling and biocycle unit / 0.3 km away / 16 May 2005Refused
- 09/7093Dwellinghouse & treatment unit / 0.4 km away / 09 November 2009Refused