DUNDULLERICK EAST, DUNDULLERICK EAST,
Planning application 03/692
DecisionRefused
Decided16 April 2003
Application typeOUTLINE PERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near DUNDULLERICK EAST, DUNDULLERICK EAST,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 04/7201Dwellinghouse / 0.0 km away / 16 November 2004Refused
- 19/6203To construct a straw bedded cattle shed with slatted tank and ancillary works. / 0.1 km away / 29 October 2019Refused
- 11/4215Construction of a storey and a half dwellinghouse and detached garage / 0.3 km away / 04 April 2011Refused
- 10/6002Two storey house with detached garage, sewage treatment plant and percolation area together with driveway and new entrance / 0.3 km away / 04 October 2010Refused
- 11/4625Retention of dwelling, treatment unit, percolation area and entrance as constructed / 0.4 km away / 23 May 2011Refused
- 24/5630A 10 Year planning permission for a solar farm with a total area of circa 179 hectares. The solar farm will consist of solar panels on ground mounted frames, 25no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 3 no. Ring Main Units, 7 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L7691 and L7692 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 7 no. stream/drain deck crossings, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be 4 no. entrances from the R626, L7691 and L7692. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. / 0.5 km away / 01 September 2025Refused
- 03/6369Dwelling House / 1.0 km away / 13 February 2004Refused
- 09/7288Dwelling and wastewater treatment unit / 1.1 km away / 02 December 2009Refused